We regularly offer top prices for the collection and on-site dismantling of wastewater treatment equipment, chemical equipment, including equipment for recycling, centrifuges, filters, wastewater treatment chemical pumps, reactors, heat exchangers, dryers, mixers, crushers, valves, blowers, compressors, vulcanizers, reducers, pipe fittings, boilers, exchangers, condensers, distillation equipment, diesel generator sets, both imported and domestic,卡特(Caterpillar)、富豪(Volvo)、康明斯(Cummins)series diesel generator sets, Doosan series diesel generator sets, Perkins series diesel generator sets, Deutz series diesel generator sets, Mitsubishi generator sets, and more.

The site pipelines of old chemical enterprises are complex, equipment is severely corroded, and factory buildings are aging. The dismantling enterprise and construction unit must ensure proper coordination, thoroughly understand the difficulties and complex stages of construction, and scientifically collect, transport, and dispose of hazardous waste remaining in equipment and pipelines according to environmental protection procedures. Ensure proper and orderly handling to maintain stability. Devote full efforts to maintaining stability during the dismantling period. This is a key guiding content and measure of our company.

During the demolition process, there must be a site supervisor present to oversee operations. If unmarked wires (cables), pipes, or other objects are found, construction should be halted, and necessary emergency measures should be taken. Worn-out materials removed should be promptly cleared from the site. Burning waste at the construction site is strictly prohibited; construction can only resume after proper disposal. All workers on site must wear hard hats, and materials should not be thrown down from heights during work.

The Engineering Demolition Organization Design (Plan) is a technical document for the preparation and entire process of demolition work, involving a joint discussion among all parties participating in the demolition, and is compiled by the demolition contractor. It aims to select an economical, reasonable, and minimally disruptive demolition plan while ensuring personal and property safety. This plan outlines and arranges for the construction preparation, demolition methods, construction deployment and schedule, labor organization, machinery and equipment, tools, and materials, as well as the overall construction layout.






























