Key Points and Methods for Laying Sintered Bricks
1. During transportation and handling, vitrified bricks must not be tipped or thrown. They should be neatly stacked and sorted, with a maximum height of no more than 2 meters.
2. Wall tie bars, seismic structural column reinforcement, large formwork concrete slab reinforcement, and various embedded parts, as well as heating, ventilation, and electrical pipelines, should all be protected and not be arbitrarily altered or damaged.
3. Mortar consistency should be appropriate; prevent mortar from splashing and soiling the wall during masonry.
4. During the installation of scaffolding on the hoisting platform or the setup of large formwork, the foreman and crane operator must carefully direct and operate to prevent collisions with the newly constructed brick walls.
5. Surround the feed opening of the derrick with plastic film or wood panels, etc., to keep the wall clean.