Foamed concrete for municipal foundation pit backfill_Engineering Undertaking Co., Ltd._Expanded polystyrene concrete for municipal foundation pit backfill, supply, machinery and equipment net, mass transfer equipment_Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd.

Lightweight Concrete Construction | Foam Concrete Construction | Cellular Concrete Construction | Cement-Based Self-Leveling | Gypsum-Based Self-Leveling

全国咨询热线
18821676737  18821676737


Foamed concrete for municipal foundation pit backfill

价      格60.00

最小起订0 Cubic库存0 Cubic

Location
Shaanxi Xi'an
有效期至
长期有效
最后更新
2022-08-16 14:58
View Count
97

Business Card

  • Your company's名称Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd.
  • 联 系 人王经理 (先生)
  • Your company'sPhone18821676737
  • Mobile号码18821676737
  • Company Address1st Floor, Building A-1, Diamond Store of Daming Palace Building Materials and Home Appliances, Weiyang District, Xi'an City, Shaanxi Province

买家正在看

  • Fine aggregate concrete subgrade backfill

    60.00

  • Gypsum-based self-leveling application

    60.00

  • Foamed concrete highway slope retaining backfill project

    60.00

  • Fine aggregate concrete construction

    60.00

Product Details

Lightweight aggregate concrete construction technique

The application method of the dry-mixed composite lightweight aggregate concrete cushioning layer during construction is also relatively simple:

Firstly, for the preliminary treatment: treat the subfloor of the floor before laying the composite lightweight aggregate mat, and clean out any impurities on the bonded subfloor.

Next, locate the control line for the high elasticity level, typically measured from the +50cm horizontal line on the wall to determine the sub-layer elevation. If possible, mark this line around the perimeter walls.

Then, it's time for mixing: first, pour an appropriate amount of water into the mixer, followed by adding one bag of pre-mixed underlayment powder. Mix until well blended, then add the composite lightweight aggregate, and continue mixing to form a uniform mixture.

Then, lay the mixed composite lightweight aggregate subbase. Use a shovel to spread it over the base layer, leveling it to the height of the previously made leveling blocks, 3mm higher than the leveling piles. Use a flat vibrator to compact it. If the thickness is thin, use a shovel and a special wooden trowel to compact it as you lay it, and immediately use a large beam for leveling. Smooth it out with a wood trowel or roll it flat with an iron roller. Complete all operations within 3 hours.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18821676737