Fine aggregate concrete subgrade backfill_Engineering Undertaking Co., Ltd._Fine aggregate concrete subgrade backfill, supply, equipment network, mass transfer equipment_Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd.

Lightweight Concrete Construction | Foam Concrete Construction | Cellular Concrete Construction | Cement-Based Self-Leveling | Gypsum-Based Self-Leveling

全国咨询热线
18821676737  18821676737


Fine aggregate concrete subgrade backfill

价      格60.00

最小起订0 Cube库存0 Cube

Location
Shaanxi Xi'an
有效期至
长期有效
最后更新
2022-08-16 14:58
View Count
92

Business Card

  • Your company's名称Shaanxi Easywin Lightweight Concrete Engineering Co., Ltd.
  • 联 系 人王经理 (先生)
  • Your company'sPhone18821676737
  • Mobile号码18821676737
  • Company Address1st Floor, Building A-1, Diamond Store of Daming Palace Building Materials and Home Appliances, Weiyang District, Xi'an City, Shaanxi Province

买家正在看

  • Foam Concrete Highway Subgrade Backfill Project

    60.00

  • Foamed concrete subgrade embankment backfill

    60.00

  • Foamed concrete highway slope retaining backfill project

    60.00

  • Fine Aggregate Concrete Construction Site

    60.00

Product Details

Lightweight aggregate concrete construction technique

The application method of the dry-mixed composite lightweight aggregate concrete base during construction is relatively simple:

Firstly, for the base treatment: Clean the impurities from the bonding base before laying the composite lightweight aggregate sub-base.

Next, locate the control line for the elevated elastic level, typically measured 50cm below the horizontal reference line on the wall, to determine the sub-layer elevation. If possible, mark this line around the perimeter walls.

Then proceed with mixing: first, add an appropriate amount of water to the blender, followed by one bag of pre-mixed base material, mix until uniform, then add the composite lightweight aggregates, continue mixing to form a uniform mixture.

Next, lay the mixed composite lightweight aggregate sublayer. Use a shovel to spread the sublayer on the base, leveling it to the height of the pre-made leveling blocks, 3mm higher than the leveling stack. Then, compact it with a flat vibratory tamper. If the thickness is thin, compact it immediately with a shovel and a special wooden tamping board, and then level it with a large straightedge. Smooth it out with a wood trowel or roll it flat with an iron roller. Complete all operations within 3 hours.


 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18821676737