The U-shaped groove forming mechanism is cleaned at the cemented joint before缝,coated with a layer of cement paste, and the joints are constructed using 1:2.5 expanded cement mortar.
2. Channel-side soil retention requires that the U-shaped groove molding machine produce particles no larger than 20cm, with uniform density and flatness.
3. According to design specifications, a gantry pile is set every 30 meters, aligned with the shape of the constructed channel, mimicking the channel type of the constructed U-shaped panels, and meticulously refining the channel.
4. During the lining process, lay 3-4 cm of 75# cement mortar at the bottom of the board, with a width of no less than 15 cm, and joints in both directions measuring 2.0-2.5 cm wide.
Contact us

Service Hotline
13986585218

Company Telephone
13986585218

Address
Huangshi Golden Mountain Economic Development Zone, Four Trees Machinery Industrial Park
b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930