House settlement observation_SupplyPro Co., Ltd._Aupu Construction Quality Inspection 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Aupu Construction Quality Inspection

Inspection and Testing Services; Water Conservancy Project Quality Inspection...

18202997639

House settlement observation

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Shaanxi/Xi'an
有效期至:
长期有效
最后更新:
2024-10-10 08:48
Product Details

Brand:

Service Scope:

National

Certificate:

Complete

Report Issuance Date:

48 hours

Price:

Transparent

Qualification:

CMA

One,What is settlement observation?

To ensure the full operational lifespan of the structure and its safety factor, as well as to provide reliable materials and relevant settlement parameters for subsequent surveying, design, and construction, the importance and necessity of structural settlement observation are even more pronounced. Current standards also require that settlement observation be conducted for high-rise residential buildings, towering structures, key ancient buildings, and continuous production equipment, as well as for basic machinery and equipment, and slope stability monitoring. Particularly inDuring the construction of high-rise residential buildings, the settlement observation and process monitor is utilized to guide the effective construction process, preventing uneven settlement during construction. It provides timely feedback on information content, offering detailed primary data to survey, design, and construction units. This helps prevent damage to the main structure of the building or the creation of harmful structural gaps due to settlement, which could lead to significant property losses.

How many times is the settlement observation generally conducted?

The frequency and timing of settlement observations should be in accordance with the design concept. Generally, the first observation should be conducted immediately after the observation point is securely installed. For industrial buildings, an observation should be made for every 1 to 5 additional stories; for public buildings, observations should be conducted at different load stages, with a minimum of 4 observations throughout the construction period (at least once at 25%, 50%, 75% load increments, and an additional observation each time). In case of temporary suspension of construction, an observation should be made both at the time of suspension and upon resumption. During the suspension period, observations can be conducted every 2 to 3 months.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
18202997639

Back to Top