Underwater Leak Sealing_SupplyPro Co., Ltd._Yancheng Subang Subsea Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Yancheng Subang Subsea Engineering Co., Ltd.

Underwater Salvage, Underwater Plugging, Underwater Cutting, Underwater Demol...

Soule Star Diamond Member
13814383733

Underwater Leak Sealing

产品Price 100.00/Next

最小起订Quantity:1 Next 供货总Quantity: 999 Next

用手机扫描二维码直达商品手机版
MobileView details
Location:
Jiangsu/Yancheng
有效期至:
长期有效
最后更新:
2023-05-10 10:24
Product Details

1. After the preliminary cleaning, prioritize the treatment of key areas such as the positive and negative corners, expansion joints, and construction joints. Especially for hard-to-paint areas like drainage holes, reinforce the treatment by applying 2-3 coats of waterproof base coating.

2. Ensure the distinction between waterproof membranes, waterproof coatings, base coatings, and adhesive membranes. Apply the base coating. To enhance the bonding between the waterproof membrane and the base, apply the base coating repeatedly, ensuring even coverage, full penetration into the concrete base, and thus improving the bonding and shear resistance strength.

3. Waterproof coating must be mixed according to the product's instructions, in a ratio of A:B = 2:1. The amount of mixing should correspond to the actual quantity used on-site.
4. The waterproof coating should be stirred thoroughly for about 3-5 minutes until the mixed liquid of components A and B is uniformly blended.

5. Apply the well-mixed waterproof coating to the designated area, ensuring the base coat covers more than the area of the adhesive membranes. The coating should be applied within no more than 30 minutes from the end of mixing to the completion of application.

6. After the base coating is applied once, wait approximately 4-8 hours before applying the second and third coats of base coating. The thickness for each coat should be around 0.5mm, with the second and third coats being approximately 0.5mm as well. It is mandatory to wait until the first coat is completely cured before applying the second coat.

7. Wait for the secondary coating to fully cure before bonding the membranes (The waterproofing coating can be applied in multiple coats or sprayed according to the actual site conditions and thickness requirements of the project; please note that a single coating should be completed in one go).

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13814383733

Back to Top