1. Pipeline shutdown
First, the pipeline must be disconnected for installation purposes. Ensure safety measures are in place to avoid potential hazards caused by water pressure during the disconnection process.
2. Installation
Install the de-ironing device according to the instructions on the pipeline, ensuring proper installation direction and flow direction, and tighten the flange screws.
Power On
If electromagnetically powered, connect the power source and ensure the wiring is properly connected.
4. Establish water supply connection
Connect the pipeline to the water source, open the water valve, and check if the de-ironing unit is functioning properly.
5. Adjust the angle
During installation, the angle between the two circles should be less than 90 degrees. Installation can only be carried out after the lifting device has been checked for stability.
6. Buckle down
The belt should be properly tightened to prevent slippage. Over-tightening the belt can increase the motor's load, reducing the belt's lifespan. Adjust the tensioning device when the belt slips.
We have covered the installation methods for iron removal tools. After purchasing the equipment, make sure to install it properly and remember to conduct a trial run before officially putting it into use to avoid any unnecessary麻烦. Furthermore, it is crucial to promptly inspect the installation after it's done. Once the installation is in place and the trial run is successful, the installation can be considered complete.
b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930
