The two villas are located in a deep excavation filling area, with a depth of 20 meters. Due to uneven settlement, the houses have tilted, with a tilt difference of 1.2 meters, and are in a dangerous condition. The core technology employed is foundation reinforcement treatment, concrete lifting pier fabrication, and correction via a PLC synchronous control system. Construction commenced in June 2018 and took 20 days.













Ying Shang County Traditional Chi
Bridge lifting and sliding bearin
Henan Pingdingshan Highway Corpor
Zhengzhou City, Zhengdong New Dis
Xuchang Yanling Flower and Plant
Anhui Jinhu Pharmaceutical Tradit
Handan Congtai District Dongwu Pr
Zhongmu County Jiefang Road Demol
