The Ying Shang County Traditional Chinese Medicine Branch Office Building Whole Structure Horizontal Moving Project. The building is a frame structure with a floor area of 5,800 square meters. It employs a PLC-controlled hydraulic synchronous shifting system, featuring rolling horizontal movement and dynamic monitoring. The building was moved northward by a total of 40 meters, representing advanced domestic technology in the field of building relocation. Construction period: September 2021 to December 2021. The building has been successfully moved into place.










Huatao Power Equipment Group Tech
Zhengzhou City, Zhengdong New Dis
Xinfahling District, Taiyuan City
Henan Pingdingshan Highway Corpor
Shangqiu Jiafu Wood Industry Offi
Zhongmu County Jiefang Road Demol
Shandong Wangwang Pharmaceutical
Handan Congtai District Dongwu Pr
