1. Field Inspection: Ensure the base layer is level and firm; if any foreign objects are found, they should be dealt with properly.
2. Field Laying: Based on the on-site conditions, determine the geotextile size, cut accordingly, and then conduct a trial laying. The cutting dimensions must be accurate.
3. Check that the萨拉 width is appropriate, ensuring that the seams are even and the tension is moderate.
4. Positioning: Use a hot air gun to bond the overlapping sections of two geotextiles, ensuring the spacing between bonding points is appropriate.
When sewing the joint, the stitching line should be straight and the stitch length even.
6. After stitching, inspect the geotextile to ensure it is laid flat and check for any defects.
7. Should any discrepancies arise, they should be rectified promptly.