详情描述


A waste landfill project in a certain province of Inner Mongolia covers an area of approximately 82,000 square meters. The technical team from Huabiao Guoxin Inspection conducted integrity tests on the geomembrane of the landfill. The landfill's slope used the electric spark method, while the waste disposal area at the bottom of the reservoir employed the dual-electrode detection method. Data analysis from the tests showed that the seepage prevention system is in good condition with no leakage points detected.

询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》