- AllProduct Category
-
Standard Regulations
Corporate Qualifications
Service Case Studies
Technical Proficiency
Geosynthetic Material Performance Testing
Soil Pollution Survey and Assessment
Landfill Environmental Safety Assessment
Long-Term Online Leak Monitoring System
Landfill Liner Integrity Testing
Geotextile Membrane Leak and Damage Detection


详情描述

Shanxi Province Datong City coal mine pit power generation enterprise ash storage project, covering an area of 61,000 square meters. The thickness of the buried coal ash is 7 meters. Currently, an integrity test of the anti-seepage system in the buried area is being conducted. On-site testing utilizes the high-density resistivity method, with normal potential inversion data indicating that the anti-seepage system is in good condition.
询价单











