详情描述


Hebei Zhangjiakou City's artificial reservoir project, covering an area of 1,600,000 square meters and a capacity of 90,000,000 cubic meters. The seepage prevention system uses 200g/1.0mm/200g filament composite membrane. After the seepage prevention construction is completed, an integrity test of the seepage prevention layer is conducted on-site using the double-electrode detection method. Thirty leakage points were found, mostly due to mechanical rolling damage. The leakage points were repaired and re-measured to meet the standards.

询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》