详情描述


Guizhou Bijie Power Generation Company's Ash Storage Field Project, covering an area of 178,000 square meters. According to the "General Industrial Solid Waste Storage and Landfill Pollution Control Standards" (GB18599-2020), leakage detection of the impermeable membrane is conducted upon completion. The slope employs the electric spark method, while the bottom of the storage area uses the double electrode method. A CMA inspection report is issued after the detection, which, along with the Construction Quality Assurance Certificate, serves as the basis for the completion environmental protection acceptance.

询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》