详情描述


The tailings pond project of a gold mine in Hami City, Xinjiang, with a designed capacity of 1.6 million m³, has been filled and is no longer in operation. According to national regulations, an impermeability integrity test of the bottom geomembrane is required before ecological sealing. High-density resistivity method was used on-site, and data analysis revealed anomalies. Surrounding groundwater and soil testing data indicators are normal.

询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》