详情描述


The Huaibei City, Anhui Province waste incineration fly ash solidification treatment center project, with a total capacity of 450,000 m³ and an area of 50,000 m², used the high-density resistivity method for leakage membrane integrity testing on-site. Post-test data analysis showed that the seepage prevention system was intact with no leakage points detected.

询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》