Introduction to Common Issues in Compaction Grouting Construction_News Center Co., Ltd._Shandong Hengshi Dingli Rock and Soil Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Shandong Hengshi Dingli Rock and Soil Engineering Co., Ltd.

The company has the construction capability to handle dyn...

24-hour Service Hotline
19553418321
15153415558
Current Location:Home>News Center Co., Ltd.>Introduction to Common Issues in Compaction Grouting Construction

    Introduction to Common Issues in Compaction Grouting Construction

    2025-01-10

    Common issues with the dynamic compaction method construction include:

    1. Excavation Bumps: This issue can arise during piling when groundwater levels are high or the soil is soft, making it difficult for mechanical operators to work underground. It can also impact the quality of backfill structures and the safe use of equipment. To address this, properly arranging the positioning and number of impacts of a vibration plate compactor is essential, as well as conducting regular horizontal measurements to maintain a level surface condition. 2. rebound phenomenon: Inadequate foundation reinforcement depth can cause this effect. It is important to minimize the damaging impact of overnight compaction holes on the working surface elevation, and avoid heavy continuous rolling at the same spot to ensure compaction effectiveness. 3. Wet settlement issues: Omissions in treatment or new sinkages after the demolition of existing buildings can lead to significant differences in bearing capacity compared to surrounding areas. This, combined with high water content in the compacted foundation, makes it difficult for geological investigation reports to accurately detect relevant information. Prevention and treatment are necessary, along with concerns over uneven settlement and other issues. Construction personnel need to adopt appropriate countermeasures based on specific situations to ensure effective quality improvements.





Contact us

Shandong Hengshi Dingli Rock and Soil Engineering Co., Ltd.
Service Hotline 19553418321
Company Phone 15153415558
Company Address No. 1, East end of the north side of Section 101 Provincial Highway, South of Xin Cun Village, Xin Hua Sub-district Office, Decheng District, Dezhou City, Shandong Province

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》