Road Crack Filling Adhesive Application, Asphalt Pavement Repair Material, Road Crack Sealing Adhesive, Easy to Apply_SupplyPro Co., Ltd._Taian Fangshuo Engineering Materials Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Taian Fangshuo Engineering Materials Co., Ltd.

Sealant, Cold Patch Material, Seam Tape, Glass Fiber Grid, Crack Sealing Tape...

Consultation Hotline
18954851522
Home > SupplyPro Co., Ltd. > Road Crack Filling Adhesive Application, Asphalt Pavement Repair Material, Road Crack Sealing Adhesive, Easy to Apply
Road Crack Filling Adhesive Application, Asphalt Pavement Repair Material, Road Crack Sealing Adhesive, Easy to Apply
品牌: Fang Shuo
Product Specifications: 25 kg/mm
Color: Black
Origin: Shandong
单价: 3200.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 8000 ton
有效期至: 长期有效
最后更新: 2024-07-02 17:16
 
详细Info

Pavement Crack Filling Adhesive Key Points:

The temperature of the road joint sealant during construction should reach 185°C, but not exceed 204°C.

2) Slot dimensions should meet design requirements, i.e., width ≥ 1cm, depth ≥ 1.3cm.

3) Prior to sealing, the groove and both sides should be kept clean.

4) The road surface temperature during construction should be maintained above 4°C; otherwise, preheating should be conducted.

5) Ensure sufficient cooling time for the pavement crack sealant before opening traffic.

6) During the heating process of pavement joint sealant, ensure even heating by using heating equipment with thermal oil or hot air as the medium to prevent burning. Therefore, when there is no equipment like a hot melt pot that can guarantee uniform heating of the material, do not use a pot for heating asphalt or other open flame heating devices to heat pavement joint sealant.


Road Crack Filling Adhesive Handling and Storage Precautions:

Do not use water when on fire; use carbon dioxide dry powder or foam.

2) Wear protective clothing, safety goggles, or other gear during working hours.

3) Keep children and other non-employees away from heating equipment or hot materials.

4) Store in a dry, cool place.

5) To ensure construction, traffic control should be implemented first, in accordance with the provisions of the "Highway Maintenance Technical Specification" regarding traffic control for highway maintenance operations, and set up cone signs and relocate.

Move the traffic signs vehicle, and assign a dedicated person to direct traffic and promptly relocate construction signs as the project progresses.


询价单

News Center Co., Ltd.

Product Categories

Contact Information
  • Contact person:李经理
  • Telephone:18954851522
  • Mobile:18954851522

 Click submit means you agree to《Service terms》《Privacy policy》

18954851522