Highway Pile Manufacturer Direct Sale_SupplyPro Co., Ltd._Yuxi County Yixin Cement Products Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Yuxi County Yixin Cement Products Co., Ltd.

Cement traffic islands, permeable bricks, curbs, riverbank bricks, slope prot...

13525509369

Highway Pile Manufacturer Direct Sale

产品Price 1.00/Piece

最小起订Quantity:1 Piece 供货总Quantity: 100000 Piece

用手机扫描二维码直达商品手机版
MobileView details
Location:
Henan/Kaifeng
有效期至:
长期有效
最后更新:
2022-04-25 16:11
Product Details

Brand

Color

Assorted colors

Measurement Unit

Brick

In Stock/Sample

In stock

Shipping Address

Open city

Product

Road Stud



Warning Post Construction Plan


Warning Pole Construction Plan 1. Molding: The warning pole mold is made of round steel, divided into two halves, with bolts welded on top to prevent it from vibrating apart and affecting its dimensions. 2. Pre-fabrication: Pre-fabrication is centralized, following design requirements, first pour the protective layer, then place the pre-fabricated reinforced components, and then pour in layers using a vibrator for compaction. After curing to the required strength, remove the mold and wrap the surface with a protective film. 3. Foundation Excavation: Due to the mobile and fragmented nature of the warning pole construction tools, the foundation is manually excavated and compacted at the bottom. 4. Spray Fluorescent Paint: Apply the fluorescent paint strictly according to the color and spacing specified in the drawings. 5. Installation: Given the characteristics of the warning pole construction, such as mobility, fragmentation, and minimal concrete usage for the foundation, the concrete is mixed into dry mix at the site with water added for mixing. This avoids segregation issues during transportation and saves resources, preventing unnecessary waste. Install the warning poles strictly according to the design depth and specifications in the drawings, using a level to control the verticality and ensuring the concrete is fully compacted. 6. Quality Requirements: 1. Quality requirements are in accordance with the design drawings, construction technical specifications, and the requirements of the client. 2. The warning poles should be vertically aligned without tilt, positioned correctly, and have bright, noticeable colors. 3. The burial depth, spacing, and height above ground should be strictly constructed according to the design drawings.

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13525509369

Back to Top