Colored Asphalt Sprayed Pavement - Asphalt Color Change Pavement - Raw Material Online Quotation_SupplyPro Co., Ltd._Shandong Luhong New Material Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Luhong New Material Co., Ltd.

Color asphalt, colored asphalt spray road surfaces, ceramic anti-slip granule...

Consultation Hotline
15806863023

News Center Co., Ltd.

Product Categories
Home > SupplyPro Co., Ltd. > Colored Asphalt Sprayed Pavement - Asphalt Color Change Pavement - Raw Material Online Quotation
Colored Asphalt Sprayed Pavement - Asphalt Color Change Pavement - Raw Material Online Quotation
品牌: Shandong Lu Hong
Origin: Shandong
Brand: Luhong
Is customization available?: Is
单价: 2300.00/Flat
最小起订Quantity: 1 Flat
供货总Quantity: 999 Flat
有效期至: 长期有效
最后更新: 2023-04-10 09:51
 
详细Info

Color Asphalt Spraying Construction Plan

I. Basic Processing:

Firstly, clean and sand the asphalt, removing road dust, laitance, oil stains, and standing water, and repair any damaged or defective areas.

2. Protect both curbs with masking tape prior to construction.

3. Close off traffic prior to construction and cover areas requiring protection, such as curbs, with a film for shielding.

4. Utilize airless spray machines for colored asphalt coating on road surfaces.

5. Approximately solidifies in 2 hours at 20℃ before being ready for traffic.

II. Construction Key Points:

Ensure the road surface is intact and clean, free of pollutants and obstructions.

2. Use appropriate filling material to mix resin mortar for repairing deep potholes or cavities in road surfaces.

3. Clean road oil stains or dirt with an appropriate cleaning agent. If rinsed with water, ensure the area is completely dried.

Before construction, ensure the road surface is dry. Use a hot air blower to dry wet surfaces, especially in winter or when frost or dew is present.

5. The newly paved asphalt surface should be allowed to settle for at least 15 days before proceeding with the construction of the colored pavement.

6. Large quantities require the use of truck-mounted mechanized construction methods to ensure the quality of work.

7. Typically, traffic is reopened 2 hours after completion of construction to ensure the asphalt coating agent has fully cured.

Section 3: Advantages of Asphalt Spraying

High strength: After curing for 48 hours, the compressive strength reaches 53MPa. Therefore, it is robust and wear-resistant, capable of withstanding the long-term rolling of heavy-duty vehicles.

2. Strong Adhesion: Tensile strength of 5.3 MPa, 3-4 times that of ordinary materials, and can firmly bond with various substrates such as asphalt, concrete, stone, tiles, and metal.

3. Excellent elasticity: Stretch ratio exceeds 40%, maintains good flexibility at low temperatures.

4. Extraordinary Durability: Resistant to oil, water, and aging, with a long service life, perfect for outdoor durable use.

5. Environmental Safety: Virtually non-volatile, belongs to VOC-free eco-friendly materials

6. Simple and Fast Installation: No special ground treatment required, installation can be completed quickly, the construction process is simple, and quality control is more manageable.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15806863023