Color Asphalt Spraying Construction - Shandong Lu Hong - Manufacturer Direct Sale_SupplyPro Co., Ltd._Shandong Luhong New Material Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Luhong New Material Co., Ltd.

Color asphalt, colored asphalt spray road surfaces, ceramic anti-slip granule...

Consultation Hotline
15806863023

News Center Co., Ltd.

Product Categories
Home > SupplyPro Co., Ltd. > Color Asphalt Spraying Construction - Shandong Lu Hong - Manufacturer Direct Sale
Color Asphalt Spraying Construction - Shandong Lu Hong - Manufacturer Direct Sale
品牌: Shandong Lu Hong
Origin: Shandong
Brand: Luhong
Can be customized: Certainly
单价: 22.00/square meter
最小起订Quantity: 10 square meter
供货总Quantity: 99999 square meter
有效期至: 长期有效
最后更新: 2023-04-10 09:41
 
详细Info

     ColorfulBitumenSpray paintingConstruction Plan

OneBasicProcessing:

1. FirstlyClean and sand asphalt to remove road dirt and debris.Sludge layer, oil stains, and water accumulationRepair any damaged or defective areas.

2. Protect both curbs with masking tape prior to construction.

3. Pre-construction closureTransportationPlease provide the Chinese content to be translated.RoadYuan (Note: "Yuan" is the name of the currency in China, so it remains unchanged in English.)Cover and protect areas requiring protection with film.

4. Using an airless spray gun forRoad surfacePerform colored asphalt spraying

5. Temperature20°C approximately solidifies2hourOpen for traffic.

Please provide the Chinese content to be translated.Construction Key Points

1. GuaranteeThe road surface is intact and clean.No pollutants or obstructions.

2. AvailableMix resin mortar with appropriate filling material to repair deep potholes or holes in road surfaces.

3. Utilize appropriatelyCleaning agent, for removing oil stains or dirt from surfaces. Must be thoroughly dried after washing with water.

4. Before constructionEnsure the surface is dry, not wetPavementRoads can be dried with a hot air blower, especially in winter or with frost and dew.Environment.

5. Newly laidAsphalt road surfaces should be open to traffic for at least15QueenYou may proceed with the construction of the colored pavement.

6. Large quantityTo ensure the quality of construction.ShouldUtilize on-board mechanized construction methods

7. As usualConstruction completed2HourPost-opening trafficTo ensureAsphaltSpray coatingAgent completelyCuredReactive

ThreeAsphaltSpray coatingAdvantages:

1. High strengthSolidify48HourSubsequently, the compressive strength has reached53MPaThereforeDurable and abrasion-resistantCan withstand the long-term碾压 of heavy load vehicles.

2. Strong adhesionTensileExtendStrength5.3MPa,IsStandard materials3-4Multipleand can be compatible with asphaltConcrete, stone, tiles, and various metalsBase MaterialRobust bonding

3. Good elasticity: Stretch ratio greater than40%At low temperaturesAlsoMaintain excellent flexibility

4. Extra-longDurability: Oil and water resistant, anti-aging, long service life, ideal for outdoor durable use

5. Environmental SafetyCuring Rate99%Above, almost non-volatile, belongs to non-VOCEmission Environmental Protection Materials

6. ConstructionSimple and quickQuickNo special ground treatment is required, allowing for quick completion of the project. The construction process is simple, making quality control more manageable.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15806863023