Ceramic Granule Anti-Slip Roadwork, Shandong Lu Hong New Materials_SupplyPro Co., Ltd._Shandong Luhong New Material Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Luhong New Material Co., Ltd.

Color asphalt, colored asphalt spray road surfaces, ceramic anti-slip granule...

Consultation Hotline
15806863023

News Center Co., Ltd.

Product Categories
Home > SupplyPro Co., Ltd. > Ceramic Granule Anti-Slip Roadwork, Shandong Lu Hong New Materials
Ceramic Granule Anti-Slip Roadwork, Shandong Lu Hong New Materials
品牌: Shandong Lu Hong
Origin: Shandong
Brand: Luhong
Can be customized: Sure
单价: 23.00/square meter
最小起订Quantity: 10 square meter
供货总Quantity: 99999 square meter
有效期至: 长期有效
最后更新: 2023-04-10 09:19
 
详细Info

Colorful anti-slip road construction technology

Colorful anti-slip road surface is mainly achieved by laying on the road surfaceA 1-2mm thick adhesive layer with high-strength aggregates, which are synthesized and calcined at high temperatures, distributed on top. After the adhesive is fully cured, excess aggregates are removed to form a colorful warning anti-slip layer. This road surface is vividly colored, suitable for scenic roads, pedestrian overpasses, anti-slip areas on dangerous sections, lane division guidance, etc. It offers strong anti-slip performance and durability, and can be customized with different particle sizes and colors of aggregates to create road surfaces and colored anti-slip materials: 2-3mm for pedestrian walkways, and 3-5mm for motor vehicle lanes.

Adhesive: GlueA/B Component Ceramic Particles

Road Closure Materials: Warning Lights, Warning Barricades, Reflective Safety Signs, Cones1 batch, lighting points

Construction Equipment: Mixers, Grinders, Hair Dryers, Construction Vehicles

 

Construction Tools: Adhesive Spatula, Roller Brush, Shovel, Wheelbarrow, Trowel, Broom

Construction auxiliary materials: edge sealing tape, gloves, masks, blades, measuring tape

Method Steps:

Remove debris from the asphalt surface prior to construction and perform a thorough cleaning and sanding to ensure the road is free of mud and other adherents, without any oil stains. Construction can only proceed once the surface is clean and dry.

2. Define the construction area, and use a vacuum cleaner to clean the dust on the road surface once more prior to beginning work.

3. Cover necessary road markings (such as lane lines) with tape to ensure they are not obscured.

Prepare construction materials, tools, and other auxiliary construction supplies according to construction requirements.


5. ToMix Adhesives A and B in the specified ratio and stir well.

6.Apply the mixed adhesive evenly over the construction section, and then spread it uniformly on the construction surface using a toothed rubber mop, ensuring the adhesive thickness is even, covers the entire construction section, and has no leakage points. The application time for the adhesive should be between 5 minutes to 15 minutes; it should not be too long to avoid the adhesive losing its adhesion due to curing.Construction Activity

7. Spread the required clean colored anti-slip aggregates evenly over the adhesive until the adhesive is completely covered by the aggregates, ensuring the aggregates are fully bonded to the adhesive and the surface is dense and level. Note: Do not press flat with force.Leakage.

8.Remove the adhesive tape promptly to ensure the road edge is not damaged, and repair any damage with the original material as soon as it occurs.

9.After the adhesive has cured, use a broom or a powerful vacuum cleaner to remove excess aggregates. Be sure to remove any aggregates that are not properly bonded. Do not contaminate the road surface during sweeping. Traffic can be reopened once all excess aggregates have been cleared.




询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15806863023