Factory and building construction; outdoor sports facility construction; outd...
产品Price Negotiable
最小起订Quantity:1 square meters 供货总Quantity: 9999 square meters
Brand |
|
Wear resistance |
High |
Flatness |
Flat |
Construction Steps 1. New concrete work that has been leveled and finished with a trowel, to be constructed after curing for 5-7 days. 2. The old concrete surface must be clean, free of oil stains, old paint, etc. 3. Apply Concrete Sealer A, ensuring it is soaked for over 4 hours. 4. Remove excess concrete sealant A, allow to dry. 5. After the ground dries, apply the concrete sealant B, allowing it to soak for over 4 hours. 6. During the soaking process, if the concrete sealer B becomes thick, sprinkle a small amount of water to dilute it. 7. Use a water scraper to remove excess concrete sealant B, then rinse the floor with clean water and dry it with a scraper. 8. Once the surface is completely dry, perform a moderate polishing to achieve a certain level of luster.