Factory and building construction; outdoor sports facility construction; outd...
产品Price Negotiable
最小起订Quantity:1 square meters 供货总Quantity: 9999 square meters
Brand |
|
Features |
Permeable and Abrasion-Resistant |
Specs |
Overall flooring |
Construction Technology When the preliminary setting of the basic concrete is 5-6% dry, spread the aggregates, striving for even distribution. The spreading should be done in two stages and ensure the required amount. 1. Apply 2/3 of the total amount, then compact and brush with a polished disc. 2. Apply a total of 1/3 of the second spread with a smooth disc to compact and groom the nap. 3. After initial setting, apply one pass of polishing with a press-polisher. 4. Inspect the flatness after spreading the material, promptly add more material to low spots for adjustment, then compact and abrade the area to smooth it out. 5. Prior to completion, use a polishing machine for finishing to achieve the工艺完成 (process completion).



Phone Consultation