




Daze Power 190A Diesel Generator Welding Machine TO190A
Knowledge of operation
1.The welding machine should be installed indoors and have a reliable grounding. When multiple welding machines are installed in parallel, the distance between the two should be at least3The meter should be connected to power sources of different phases, and a separate knife switch should be set up. The wire between the knife switch and the welding machine should be protected with a sleeve.
2.Before operation, check whether the pressure mechanism of the welding machine is flexible and whether the fixture is firm. Tools that use pneumatic or hydraulic transmission should be checked for proper functioning of their systems.
3.welding machinewantOnly after proper grounding can it be used to ensure personal safety 。
4.After checking the safety situation around the welding machine, connect the welding machine power and compressed air. The welding machine should be watered before welding, and it is strictly prohibited to work without water. Cooling water should be ensured to0.15--0.2MPa Supply under inlet pressure5--30 Industrial water at ℃.
5.The welding machine lead should not be too thin or too long, and the voltage drop during welding should not exceed the initial voltage10%The initial voltage cannot deviate from the power supply voltage by ±10% 。































