
Installation Instructions:
① Conduct rubber filling treatment on damaged areas requiring repair (refer to the filling section in the vulcanization process of tape joints, or have the factory service personnel demonstrate during equipment debugging).
② Place the lower frame beneath the repair area (evenly), then position the water pressure plate beneath the tape on the frame, and the lower heating plate directly above the repair area.
③ Place a heating plate, an insulating plate, and then the upper frame below the repaired area, aligning it with the lower frame.
④ Install the handle, washer, and nut and tighten securely.
⑤ Connect the control box to the power source with a single wire, and connect the heating plate to the control box with a separate wire. Ensure the connections match the labels on the control box.
⑥ Connect the pump to the pressure plate with a high-pressure hose, turn on the electrical control box, and fill the pressure plate with water to the vulcanization pressure.































