
Installation Instructions:
① Perform rubber filling on the damaged areas requiring repair (refer to the filling section in the vulcanization process of tape joints, or have the factory service personnel demonstrate during equipment debugging).
② Place the lower shelf beneath the repair area (evenly), then position the water pressure plate under the tape on the shelf, and the lower heating plate directly above the repair area.
Place a heating plate, an insulating plate, and then the upper frame directly below the repaired area, aligning it with the lower frame.
④ Install the handle, washer, and nut, then tighten securely.
⑤ Connect the control box to the power source with one set of wires, and connect the heating plate to the control box with another set of wires. Ensure the connections match the labels on the control box.
⑥ Connect the pump to the water pressure plate with a high-pressure hose, turn on the electrical control box, and fill the water pressure plate with water to the vulcanization pressure.































