Tenyan Megalong Diving and Rescue Co., Ltd.VIP

水下打捞 潜水员 潜水打捞 打捞队 声纳 水下切割
Enter Shop

Underwater Recovery Company | Underwater Construction Company | Professional Construction Team

平台认证
  • Unit Price

    $100.00/piece

  • Brand

    Mega Dragon

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



十堰兆龙潜水救援有限公司

VIP   采商通第1年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Mega Dragon

  • Unit Price:

    $100.00 / piece

  • MOQ:

  • Total:

    0piece

  • Address:

    HubeiShiyan

  • Delivery:

    0Hours

  • View More

Description

Mega Dragon Diving Rescue Co., Ltd. has been established since its inception.Primarily refers to underwater engineering work in rivers, lakes, seas, reservoirs, etc., while today, diving engineering is more often used for offshore oil drilling projects. Common technical equipment includes underwater video equipment, underwater welding and cutting equipment, diving gear in various weights, underwater concrete equipment, etc. Diving technicians must obtain qualifications, have diving work experience, and meet certain requirements for the depth of underwater operations.

1. Construction and Safety Measures: 1) Before underground operations, brief the team on well depth, entry depth, water level difference at both blockades, water depth, and water flow conditions. Clarify the objectives and specific technical requirements of the construction. 2) Divers must be certified and equipped, with normal physiological signs. Ensure that equipment is functioning properly, communication is clear, and personnel are in good health before entering the well. 3) Prepare rescue equipment and personnel. In addition to regular divers and equipment, have a separate set of rescue gear and staff ready to prevent accidents during operations. 4) During underground operations, ground personnel are positioned. Compressor maintenance staff: Ensure the compressor runs smoothly during the dive and report any issues to the communications officer; Ground maintenance staff: Responsible for coordinating between personnel to meet the needs reflected from underground; Communications staff: Communicate with underground personnel to understand their work status and needs, as well as the safety conditions at each work site. 5) This operation primarily involves cutting, clearing pipes, and cleaning debris before building walls. Divers will enter the well only after confirming that there is no significant water flow, once both sides have evened out after the breach. Due to the gases and water underground, special requirements are placed on equipment, such as pneumatic, hydraulic, and low-pressure equipment. 6) The hoisting crew follows the communications officer's instructions and is attentive to underground conditions. Hoisting is strictly prohibited when someone is at the wellhead. Before each hoisting, signal the diver to confirm a safe entry position. Place the hoisting item aside for the client's confirmation. 7) Site clearance operations. After completion, ensure safety at the construction site and wellhead, primarily securing the well cover. 8) In the event of serious injuries or other safety accidents, Party B shall immediately report to relevant authorities (110) and notify Party A, while also handling the situation as per departmental requirements. To ensure timely rescue, know and memorize the nearest medical phone numbers and route maps. 9) Party B shall comply with the safety management system for construction projects, strictly organize construction according to safety standards, and take necessary safety precautions.

Diver underwater maintenance, underwater inspections, reservoirs, underwater photography, underwater rescues, underwater surveys, underwater demolition, underwater photography, underwater piling, underwater leak repairs, underwater hole repairs, underwater recovery, underwater plug holes, diving leak sealing, diving welding, diving operations, diving cutting, diving work, diving services, diving construction, diving reinforcement, underwater filming, diving installations, underwater dredging, diving inspections, diving feelers, diving sealing, etc., for various underwater construction projects (24/7 service).


Completed various underwater construction tasks for numerous owners and clients. Specialization is our accumulated instinct, meticulous execution is a consistent requirement of YuRong's team, firmly grasping responsibility and delivering top-notch construction services. In every step of future operations, we will maintain the standards and service quality of underwater engineering. Trust us to provide you with a unique underwater experience.



Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $100.00 / piece
Inquiry None
Delivery HubeiShiyan
Brand Mega Dragon
Brand Mega Dragon
Job Type Manual operation
Work Method Diving Operations
Expiry Long Valid
Update 2025-07-08 15:03
Gallery

Tenyan Megalong Diving and Rescue Co., Ltd.Published byUnderwater Recovery Company | Underwater Construction Company | Professional Construction TeamGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top