Shunye Electrical is a technology-based manufacturing company.,Please provide the Chinese content you would like translated into American English.2015Established annually, the company is located in Jiangsu, China./Yangzhou, Baoying County, Liubao Industrial Zone.Scope of Business:Yangzhou Shunye Electrical Co., Ltd. specializes in the production of insulating materials and is a supplier code for China Aluminum.:gys423102aProviding high-quality products to numerous large domestic enterprise groups:China Aluminum Corporation, China Hongqiao Group, State Power Investment Corporation, Shanghai Electric Group, Panzhihua Iron and Steel Group, China Dongfang Electric Corporation, Southern Grid Corporation, Baoding Group, 22nd Construction Company, 7th Construction Company, 17th Construction Company, etc.
Flexible Mica Sheet Utilizing various CNC machining equipment, we manufacture a variety of insulating material products according to customer drawings, creating insulating components in different shapes.,Insulating tubes, rods, boxes, andVForm rings, etc.
Flexible Mica Sheet Points to note in processing:Choose the design datum on the part as the positioning datum as much as possible. When establishing the processing plan for the part, the first step is to select the precise datum for processing on the machining center. This requires considering how to process the various faces of the precise datum using rough datums during the corresponding processing. The various positioning datums used on the machining center should be processed in the preliminary operations of the common machine or ring hydrogen board machining center. This ensures the accuracy relationship between the processing surfaces at different stations, and when certain surfaces still need to be processed through multiple clamping or on other machines, selecting a datum positioning that matches the design datum can not only avoid positioning errors caused by misalignment of the datums, but also maintain processing accuracy and facilitate programming.
Secondly, when it is not possible to complete the machining of positions including the design datum simultaneously on the CNC machining center, it is advisable to make the positioning datum coincide with the design datum as much as possible. At the same time, consideration should also be given to the fact that, after positioning with this datum, the machining of all critical precision parts can be completed in a single setup. To avoid the need for multiple non-essential dimension machining of the parts after finishing, resulting in deformation, knocks, and scratches, it is considered to complete as much machining content as possible in one setup.(As for tapped holes, clearance holes, chamfers, non-critical surfaces, tool inspection, etc.)At the same time, the processes completed on the machining center are generally scheduled later. Thirdly, when both the datum and the processing at each station are completed on the CNC machining center, the selection of the positioning datum must consider completing as much processing content as possible. To this end, it is necessary to consider positioning methods that facilitate the processing of all surfaces, such as for the housing, using a two-bolt positioning method on one side to allow the tool to process other surfaces.





































