| Origin | Shandong | Specific Gravity | 2.7(g/cm3) | Compressive Strength | 1500(MPa) |
| Bending Strength | 1400(MPa) | Application Range | Civil Engineering, Park, Plaza | Material | Granite |
| Glossiness | 60 | Brand | Zhuoke Stones | Color | Brownish red |
| Hardness | Mo Style 7.4 | Impurities | 0.03% | Specification | 300*600*30(mm) |
| Is cross-border sourcing available? | No |






Shandong shrimp red, either in the later or early stages of processing, can be manufactured into various boards for flooring in construction projects. Stone requires joint treatment during installation. The jointing of Shandong shrimp red demands meticulous craftsmanship, with each step needing to be executed properly. What issues should be noted when processing Shandong shrimp red for jointing?
Shandong shrimp red processing, a shift in processing direction.
To achieve professional Shandong shrimp red stone mosaic, a crucial step is to master the directional processing. This entails exposing the stone's side, where the frontal design surface is to be shaped manually around a mold, ensuring consistency in the design between the front and side.
Two, assembly of double-sided door casings.
The construction site features door casings on both the front and back. This stone processing requires high precision, as the product thickness must be controlled from the cutting stage. If there is a significant thickness error, attention must be paid to marking the side of the molding surface with a chalk box and drawing a straight line at the beginning and end of the stone during assembly.
Section 3: Groove Machining
The processing of grooves refers to the machining of grooves on the shaping surface. The size and depth of the grooves have a direct impact on the aesthetic appearance of the product. They are closely related to the product's usage and design. The processing of grooves should be controlled on a die machine.
Four: Cut corners first, then assemble.
This refers to a set of assembled products that require cutting angles of 45 degrees or any other angle, such as door frames, waist lines, etc. They must be cut before assembly. If assembled first and then cut, there will be a noticeable mismatch in the joint between the shaped surface after cutting and the adjacent shaped surface, necessitating further assembly adjustments.
V. Product Number for Assembled Items.
After assembly stone processing is completed, the stones are pre-assembled according to the assembly diagram. On the back of the stones, they are numbered in order from left to right, facilitating installation and construction on-site.



























