Electric heating water-cooled vulcanizing machine for conveyor belt joints is a special equipment for bonding the ends of conveyor belts. The machine is made of lightweight aluminum alloy, featuring a compact size and light weight, powered by standard three-phase power supply. It boasts even heat plate temperature and a water pressure system that provides a uniform pressure of 1.0 to 2.0 MPa. Equipped with a lightweight automatic electric control box, the connection between the control box and the main unit is achieved through an integrated plug and multi-core cable, ensuring ease of operation and reliable performance. It also has the advantages of rapid temperature rise, even temperature distribution, and high thermal efficiency, making it an ideal bonding equipment for conveyor belt joints.
The quality of the tape joints directly impacts the tape's working efficiency and lifespan, especially for long-distance, high-intensity conveyors, which is even more critical now.XSDGLJLThe type electric hot-molding tape vulcanizing machine is an indispensable auxiliary equipment in the current tape conveying machinery.
Usage:
This product is widely applicable, suitable for transportation joints of conveyor belts in fields such as metallurgy, chemical industry, metal mines, power plants, ports, and docks. With the technical parameters provided by this machine and proper vulcanization, the tensile strength of the conveyor belt is maintained at over 90% of the original, ensuring not only a smooth joint that is almost indistinguishable from the original belt but also a reduction in wear on the drums and an extension of the service life of the conveyor and rubber belt.
Electric Heating Tape Vulcanizing Machine Technical Specifications
Sulfur pressure: 1.5 MPa
2. Sulfurizing Temperature: 145℃
3. Sulfur plate surface temperature difference: ±3℃
4. Heating time (from room temperature to 145℃) is not more than 25 minutes.
5. Power Voltage: 380V, 660V, 50Hz
6. Control cabinet output power: 36 Kw
7. Temperature Control Range: Room temperature to 200℃
8. Timing Adjustment Range: 0-59 min
9. Upper and lower heating plates pressure: After 0.8mpa, the gap is not greater than 0.5min.