PP Structural Lab Bench

During water supply preparation, the water vertical pipe and meter should be installed in the pipe well on the left side of the PP test bench door. The water supply is routed to the back wall of the cabinet through the ceiling. The remote-controlled water nozzle switch is mounted on the outer side below the cabinet door. The floor drain's drainage passes through the floor and is led to the water supply and drainage vertical well through the ceiling of the next floor. The floor drain is set on the left wall edge, and the drainage vertical pipe is installed in the pipe well on the left side of the laboratory door. Water valves with ceramic or copper cores are required for the water pipes. The cabinet of the PP test bench should also reserve a water pipe position, usually with a pipe diameter of 20mm and a drain pipe diameter of 50mm, so the reserved height can be set at 200mm.
The setup of the water and electricity system for the PP lab bench is crucial. When setting it up, attention must be paid, otherwise, it will affect our normal operations. Therefore, we need to remember and understand the relevant precautions and operate correctly.