PP biological deodorization tower can be widely used in various urban sewage stations, wastewater tanks, garbage treatment stations, filtration reaction tanks, paint factories, breeding farms, food and beverage factories and other places with damp and foul odors. Most organic waste gases require deodorization treatment during purification, and can be treated with waste gas treatment equipment or integrated purification and deodorization equipment - biological filtration tower.
Equipment structure:
The biological filtration tower can be made of FRP fiberglass or PP plastic, stainless steel materials according to the actual situation, with a box structure, equipped with a washing area, biological purification area, dehydration area, and spray circulation system.

Installation and use instructions for biological deodorization tower:
1. When users install biological deodorization equipment, they need to build a concrete foundation at a height of more than 150mm above the ground, and the water pump and fan should have a separate concrete foundation as required.
2. Attention should be paid to the protection of the product during transportation and installation, and the body and components should not be damaged.
3. When we leave the factory for exhaust gas treatment equipment, we will use segmented packaging and transportation according to the specific situation, and have technical personnel install and debug it on site.
4. If the biological deodorization equipment is to be used outdoors, anti freezing measures should be taken at the bottom water pool of the tower in winter.
5. There is a liquid level mark on the bottom pool of this device. Before use, be sure to inject the absorption solution according to the liquid level mark. Attention should be paid to replenishing absorbent solution during use.
6. When using, the purification tower should first turn on the circulating water pump for 2-3 minutes before starting the blower. When stopping, the blower should be stopped for 1-2 minutes before stopping the circulating water pump.
7. Regularly check the acidity depth of the liquid in the bottom water tank of the tower and the degree of gas purification at the exhaust outlet according to the usage situation. If it exceeds the standard. The absorbent in the bottom pool should be replaced.
8. Please note that the user service will conduct a maintenance on the biological deodorization equipment after one and a half to two years of use, checking the filling of the disc-shaped spray pipes and fillers, and cleaning them.

The company is a one-stop enterprise specializing in the design, development, production, sales, and installation of exhaust gas treatment equipment and engineering. Focusing on various workshop indoor ventilation system projects, various exhaust gas suction, dust removal, purification, deodorization treatment and other ventilation and environmental protection projects. We wholeheartedly cooperate with Chinese and foreign friends to create brilliance together.






















