Jiangsu Xin Da High Altitude Engineering Co., Ltd.VIP

烟囱新建、设备防腐、烟囱拆除、烟囱维修、防水堵漏
Enter Shop

Chimney Corrosion Prevention & Chimney Aesthetics

平台认证
  • Unit Price

    $100.00/square meters

  • Brand

    New High Sky

  • MOQ

    1square meters

Contact
Leave Msg

Platform Service

Supplier Verified



江苏新大高空工程有限公司

VIP   数字营销第3年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    New High Sky

  • Unit Price:

    $100.00 / square meters

  • MOQ:

    MOQ1square meters

  • Total:

    9999square meters

  • Address:

    JiangsuYancheng

  • Delivery:

    3days

  • View More

Description

Based on years of experience and actual conditions, the construction is carried out using the suspended work method without scaffolding.

Brush the shipping mark:

Elevators working on chimney tops should be securely fastened with safety belts while operating on the roof platform.The φ20 nylon rope is securely tied and lowered onto the triangular support of the chimney platform. Additionally, a φ20 nylon rope auxiliary safety line is used, with each person's safety belt locked onto the auxiliary line using a self-locking device (totaling three φ20 nylon ropes for two people). This enhances safety coefficients and ensures security.

Construction workers use seated elevated boards to access.The U-bolt installation is conducted from top to bottom, ensuring smooth progress for the construction crew. During continuous production, the first step is to treat each exposed reinforcement on the outer wall from top to bottom, removing any loose parts. The exposed reinforcement is then manually de-rusted and polished until the surface is free of rust. To repair the exposed reinforcement and loose areas, a polymer reinforced patching mortar is used (due to the strong bond between the polymer patching mortar and cement surface, it is not easily detached, but there will be a color distinction).All items are painted twice overall, colors determined per Party A's request. At the end, the company logo and name are added on the side facing the road of the chimney (each on two sides).

Chimney platform and ladder guardrail maintenance:

Two pieces20#Lower and secure the nylon rope on both sides of the ladder at the top platform of the chimney. The construction was completed using the suspended seat board method for elevated work.

If there are solder joints that have come loose, perform welding repairs and replace any necessary parts. First, scrape off the rust layer from the platform and ladder guard mesh using a scraper. Then, brush away the surface rust with a wire brush. Apply the anti-rust paint first, let it dry, and then apply two coats of primer. After the primer dries, paint two coats of topcoat (note: wait at least eight hours between coats for the primer to dry).


   Safety Measures

1Preparation for construction should be well-done prior to commencement.,Wear a safety helmet,Fasten your seatbelt.

2Before workers climb to the top of the chimney platform for operations, they must secure their safety belts to the railing of the platform.

3Nylon rope used during construction work,All safety lanyards must be securely tied to a top, reliable anchor point and fastened around with a wire rope to prevent any accidents.

4Construction personnel operationUThe form safety lock扣 allows the working rope to descend the work level slowly. Construction personnel perform the work using a seated ladder. The construction nylon rope diameter is not less thanΦ20mmAnd undergo overload impact tests. Each construction worker must be equipped with double safety measures while operating on a main working rope before entering the construction site, (each...)2One nylon rope is shared for the secondary safety (three ropes for two people).

5Ensure that the nylon rope's anchor point is secure during each move, and reinforce it around the top edge with钢丝绳. Upon reaching the desired working position, also inspect the suspension mechanism before proceeding with the construction.

6The construction unit ensures completion within the specified period by Party A.

Quality Standards

1Construction will be carried out in accordance with the "Code for Construction and Acceptance of Anti-Corrosion Engineering of Buildings."

2Install in accordance with the technical standards of anticorrosion materials.

3Construction to be performed according to the client's specifications.

Quality Assurance Measures

1In accordance with the requirements of Party A, the construction shall be carried out in compliance with the relevant provisions and standards stipulated in the industry standards.

2Before construction, organize all construction personnel to study and discuss the plan, and gain a thorough understanding of the construction process.

3Ensure technical briefings for construction teams, ensuring each worker follows the prescribed construction requirements.

4Adopt a system of self-inspection, mutual inspection, regular, and irregular inspections to ensure the quality of the project.

5The quality inspectors of Party A and Party B shall supervise and monitor the construction process throughout.

6Upon confirmation of the first process being qualified, the construction of the subsequent process may proceed.

7Follow the product manual and technical requirements strictly during installation.

Safety Technology

1Prohibited from dumping the remaining paint and solvents anywhere.

2The construction site should have adequate ventilation.

3Workers should not work continuously for too long; they should take breaks to leave the construction site and breathe fresh air.

Quality Acceptance

1Paints should have a product qualification certificate and pass re-inspection.

2The site conditions at the construction site should meet painting requirements.

3During the painting process, the thickness of the coating should be checked at all times, and there should be no chipping, peeling, or bubbling.

Civilized Construction Measures

1Safety Goals: Eliminate all personal injury accidents and equipment damage incidents.

2Comply strictly with the safety technical specifications for high-altitude operations issued by the labor department and the detailed safety regulations for high-altitude operations of the company, as well as all civil construction regulations set by Party A.

3Party B shall, in accordance with the characteristics of this project, formulate a civilized construction system and enhance management.

4Construction site clothing should be neat, ensuring a civilized construction image. Unauthorized entry or exit is prohibited in non-construction areas.

5Maintain strict control over secondary pollution during construction to ensure site cleanliness.

6Maintain cleanliness and hygiene on-site, promptly clearing ground debris.

7Comply strictly with the other relevant regulations on civil construction as specified by Party A.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $100.00 / square meters
Sales None
Delivery JiangsuYancheng3dayswithin
Stock 9999square metersMOQ1square meters
Brand New High Sky
Brand New High Sky
Service Content 70-meter chimney new anti-corrosion treatment
Engineering Type Chimney new construction corrosion protection
Expiry Long Valid
Update 2023-07-13 13:33
Gallery

Jiangsu Xin Da High Altitude Engineering Co., Ltd.Published byChimney Corrosion Prevention & Chimney AestheticsGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top