Basement sewage pool tunnel leak-proofing

平台认证
  • Unit Price

    $100.00/Rice

  • Brand

    Jiangsu Xin Da

  • MOQ

    1Rice

Contact
Leave Msg

Platform Service

Supplier Verified



江苏新大高空工程有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Jiangsu Xin Da

  • Unit Price:

    $100.00 / Rice

  • MOQ:

    MOQ1Rice

  • Total:

    9999Rice

  • Address:

    JiangsuYancheng

  • Delivery:

    3days

  • View More

Description

Chimney Leak Sealing, Cooling Tower Leak Sealing, Underground Leak Sealing, Waterproofing Leak Sealing, Tunnel Leak Sealing, Basement Leak Sealing, Pressure Sealant Leak Sealing, Septic Tank Leak Sealing, Expansion Joint Leak Sealing, Wet Leak Sealing, Coal Handling Corridor Leak Sealing, Leak Sealing Company, Professional Leak Sealing, Underground Parking Garage Leak Sealing

 

Product Details (Leak Sealing)

I. Construction Operation Process

1. Sealing construction joints and settlement cracks to prevent water leakage (backwater pressure backflow prevention method): A combination of two methods, joint sealing and grouting, is used. First, remove loose debris from the original leaking joints, clean and flush them thoroughly, then use rapid-setting water-stop materials for pipe extraction, burial, and water flow reduction operations. Do not fill the grooves completely at once to allow space for joint sealing. bury a bamboo joint (grouting nozzle) at certain intervals. After the stop-set material reaches a certain strength, reverse-pressure injection with rapid-setting cement can be done through the bamboo joints. Then, fill and compact the surface layer above the water-passing deformation joint grooves with casting materials. A combination of material waterproofing and combined waterproofing is adopted, i.e., a long-lasting waterproofing and leakage prevention process that combines rigidity and flexibility.

Inspect the leaking sections and, according to the contractor's specifications, initially seal the obvious leaking cracks.

2. Clean the leaking area and chisel the leaky seam into a U-shaped opening of 3.5x4.5 inches.

3. Leakproof seam, pre-buried bamboo joints, clean the leaky seam, fill with sealing material, install drainage pipes and bamboo joints (grout nozzle).

4. Reduce water flow by diverting and compressing, control leak points, change from large to small water flow, allowing the small water flow to exit through the installed diversion tubes.

5. Ingredients: Mix several chemical high polymer reagents into two batches of slurry. Determine the curing time of the ingredients based on the size of the leakage.

6. Grouting: The pressure of the grout must be greater than the pressure of the leak to push the water back and infiltrate into the concrete capillary cracks. Upon contact with water, it expands and sets rapidly, achieving deep-seated water stopping effects.

7. Excavate the bamboo joints (optional), then fill and level with packing material.

8. Surface treatment: After self-inspection with no leakage, fill and level the surface with paste.

  II. Material Introduction

The product has an appearance of a pale yellow to amber clear liquid, and it is composed ofA two-component high-pressure sealing material composed of 5 types of chemical high polymer additives, a fast-acting, high-efficiency polymer elastic material that can both seal leaks and reinforce. Suitable for waterproofing and leakage prevention treatment in construction joints, deformed cracks, and concrete honeycombs in water conservancy, power, tunnels, subways, civil defense, mines, basements, and various other applications. This material can be mixed in any proportion to create materials with different strengths, different permeation depths, different curing times, and different expansion ratios. After grouting, as long as the deformation in the joint does not exceed 1-2 cm, leakage is impossible.

 Section 3: Material Features

  1. This material has excellent hydrophilicity, reacts with water, and simultaneously generates CO.2Gases infiltrate and diffuse upstream along the incoming water channel, consolidating with surrounding concrete, sand, and soil, rapidly hardening into an impermeable layer. This method is widely used for sealing high-pressure water inrushes and preventing water flow and seepage in foundations.

  2. The material has a strong bonding capacity with concrete and soil particles, allowing for the production of high-strength elastic solidification. Consequently, it can fully adapt to the deformation of the foundation or sub-base, making it less prone to cracking or collapse, and achieving initial reinforcement.

  3. In hydrated structures, the slurry is not washed away, and during its reaction process, due to gas diffusion, the effective consolidation area rapidly increases, resulting in a much larger solidified mass than that of other types of chemical slurries.

  4. Adaptable to various engineering requirements, the adjustable viscosity of the grouting fluid allows for quick penetration into fine cracks in concrete structures like basements, forming a strong, impermeable, and high-strength solidification.

  5. The solidification rate of the slurry can be adjusted according to construction requirements.

  6. The construction utilizes single feed grouting equipment, which is easy to clean, with a simple and straightforward process, and offers lower overall costs.

  7. The solidified mass is harmless, non-toxic, and non-polluting when soaked in water.

  IV. Material Technology Guidance

  Appearance:Light amber transparent liquid

  Density:1.0-1.10 g/m3

  Viscosity:100-400 20℃,Mpa.s

  Gel Time:dozens of seconds- Several tens

  Bond Strength:≥1.0 Mpa

  Expansion Rate:≥300%

  Package Water Content:20x

  V. Construction Operation Techniques and Key Points

Construction Process

Identify leak location→ Clean leaky subgrade → Drill → Clean → Install nozzle → High-pressure grout material injection → Observe → Patch leaks → Remove grouting nozzle → Slot hole repair → Inspect → Acceptance

  2. Construction Key Points

1) Target and clean the leakage points, ensuring the渗漏 areas are thoroughly cleaned.

2) Pre-bury the grouting pipes with a quick-sealant, the spacing should be determined according to actual conditions, generally about 1 meter.

  (3) Inject the chemical polymer material leakage stopper through the grouting tube into the concrete gap using a high-pressure grouting pump until it can no longer be pushed in (injection rate ≤ 0.011/min). Then, close the valve and cut off (remove) the grouting nozzle.

  (4) Clean the equipment and tools promptly with solvent after casting.

5) Maintain ventilation at the construction site, be vigilant about fire safety, and strictly prohibit any open flames.

3. High-pressure grouting leakage sealing method

  (1) This method utilizes the tremendous pressure generated by a high-pressure injection machine to deliver materials into the middle of the wall gaps, causing them to expand radially from the center. After a rapid reaction and hardening with water, the gaps are filled, achieving the effect of reinforcing the foundation and preventing leaks and seepage.

  (2) The high-pressure grouting machine used in this technique has high grouting pressure and large flow rate, capable of quickly stopping water, indeed an effective water-blocking method.

  (3) This method starts the pouring point from the center of the structure, and is particularly fast and effective for sealing leaks in concrete walls thicker than 10 centimeters.

  Six. Quality Assurance

1. Strictly maintain material quality control; chemical high polymer slurry materials used ensure engineering quality for over 5 years.

2. Strict adherence to operational procedures and technical specifications; no shortcuts or substandard workmanship during construction.

3. Adhere to the inspection and acceptance system, maintaining self-inspection, mutual inspection, and specialized inspection.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $100.00 / Rice
Sales None
Delivery JiangsuYancheng3dayswithin
Stock 9999RiceMOQ1Rice
Brand Jiangsu Xin Da
Service Target National wide
Service Types Basement waterproofing and leak sealing
Company Name Jiangsu Xinda High Altitude Engineering Co., Ltd.
Expiry Long Valid
Update 2023-07-13 13:36
Gallery

Jiangsu XinDa High Altitude Engineering Co., Ltd.Published byBasement sewage pool tunnel leak-proofingGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top