Power plant and chemical industry chimney beautification, anticorrosion, and color ring coating

平台认证
  • Unit Price

    $100.00/square meters

  • Brand

    Chimney corrosion prevention

  • MOQ

    1square meters

Contact
Leave Msg

Platform Service

Supplier Verified



江苏新大高空工程有限公司

VIP   数字营销第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Chimney corrosion prevention

  • Unit Price:

    $100.00 / square meters

  • MOQ:

    MOQ1square meters

  • Total:

    9999square meters

  • Address:

    JiangsuYancheng

  • Delivery:

    3days

  • View More

Description

High-rise Anticorrosion, Professional Anticorrosion, Anticorrosion Company, Chimney Anticorrosion, Chimney Internal Wall Anticorrosion, Chimney Aesthetics, Cooling Tower Anticorrosion, Cooling Water Tower Anticorrosion, Cooling Water Tower Internal Wall Anticorrosion, Cooling Water Tower Aesthetics, Equipment Anticorrosion, Steel Structure Anticorrosion, Ladder Anticorrosion, Port Machinery Anticorrosion, Port Crane Anticorrosion, Gantry Crane Anticorrosion, Tower Crane Anticorrosion, Color Ring Painting, Navigation Mark Painting, Old Chimney Anticorrosion, Desulfurization Anticorrosion, Platform Anticorrosion, Chimney Color Ring Painting, Chimney Decoration, Chimney Ladder Paint Anticorrosion, Iron Chimney Paint Anticorrosion, Pipe Anticorrosion and Insulation, Oil Storage Tank Anticorrosion, Sewage Pool Anticorrosion

 

Product Details (Corrosion Protection)

 

Corrosion Prevention Construction Plan

 

Based on years of experience and practical situations, the construction is carried out using the suspended work method without scaffolding.

One: Brush the shipping mark

Construction Method: When construction personnel are operating on the top platform of the chimney, they must secure their safety belts.The φ20 nylon rope is securely tied and lowered onto the triangular support of the chimney platform. Additionally, a φ20 nylon rope secondary safety line is used, with each person's safety belt locked onto the secondary line using a self-locking device (total of three φ20 nylon ropes for two people). This increases the safety factor, ensuring a 100% safety guarantee.

Construction personnel use seated elevated platforms to access.The U-bolt installation is conducted from top to bottom, ensuring a smooth construction process. Construction is carried out without production halt, starting with the outer wall reinforcement exposed at each point, treated from top to bottom around the exposed reinforcement. Loose materials are removed, and the exposed reinforcement is manually de-rusted and polished until the surface is free of rust. To repair the exposed reinforcement and loose areas, polymer reinforced patching mortar is used (due to the strong bond between polymer patching mortar and cement surfaces, it is less likely to fall off, but there will be a color distinction).After the entire surface is painted twice, the color ring is determined according to the client's requirements, and finally, the company logo and name (each on two sides) are added to the chimney facing the road.

Chimney platform and ladder guardrail maintenance:

Two pieces20#The nylon rope is lowered and secured to both sides of the ladder on the top platform of the chimney. The construction was completed using the suspended seat board method for elevated work.

If there are solder joints that need to be repaired, do so; replace any that are required. First, scrape off the rust from the platform and ladder guard mesh using a putty knife, then brush off the surface rust with a steel wire brush. Apply anti-rust paint first, then wait for it to dry before applying two coats of primer. After the primer dries, apply two more coats of finish paint (note: wait at least eight hours between coats to allow the primer to dry).

   Safety Measures

1Ensure all preparatory work is completed before construction.,Wear a safety helmet,Secure your seatbelt.

2Before ascending to the chimney top platform for work, construction personnel must securely fasten their safety belts to the railing of the platform.

3Nylon rope used during construction work,All safety lanyards must be securely fastened to a reliable anchorage point at the top and secured with a wire rope loop for added safety.

4Construction personnel operationUSafety lock clips gradually lower the work rope to the work level. Construction personnel perform work using seated climbing boards. The construction nylon rope diameter is not less thanΦ20mmAnd conduct overload impact tests. Each construction worker must have dual safety measures in place while operating on a main work rope before entering the construction site, (each...)2Each person shares one nylon rope as a secondary safety line (three ropes for three people).

5Each time you move, check that the nylon rope's anchor point is secure, and reinforce it around the top with钢丝绳. Upon reaching the desired work position, inspect the suspension mechanism before proceeding with the construction.

6The contractor ensures completion within the stipulated timeframe by the client.

Quality Standards

1Construction will be conducted in accordance with the "Code for Construction and Acceptance of Anti-Corrosion Engineering for Buildings."

2Construct in accordance with the technical specifications of the anti-corrosion materials.

3Per the client's specific requirements, proceed with construction.

Quality Assurance Measures

1In accordance with the requirements of Party A, construction shall be carried out in compliance with the relevant provisions and standards of national industry standards.

2Before construction, organize all workers for a study session and discussion of the plan, to gain a thorough understanding of the construction process.

3Ensure technical briefings for construction teams, ensuring each worker follows the prescribed construction requirements.

4Implement a combination of self-inspection, mutual inspection, regular, and irregular inspections to ensure the quality of the project.

5The quality inspectors from Party A and Party B should oversee the construction process throughout.

6Upon confirmation and acceptance of the first process, the subsequent process may then be carried out.

7Follow the product manual and technical requirements strictly during installation.

Safety Technology

1No dumping of leftover paint and solvents on the ground is permitted.

2The construction site should have adequate ventilation.

3Construction workers should not work continuously for too long; they should take breaks to leave the construction site and breathe fresh air.

Quality Acceptance

1Paint should have a product qualification certificate and pass the re-inspection.

2The construction site's environmental conditions must meet the painting requirements.

3During the painting process, the thickness of the coating should be continuously monitored, and there should be no issues of chipping, peeling, or bubbling.

Civilized construction measures

1Safety Goals: Eliminate all personal injury accidents and mechanical or equipment damage incidents.

2Comply strictly with the safety technical specifications for high-altitude operations issued by the national labor department and the detailed safety regulations for high-altitude operations as stipulated by the company, as well as the various civil construction regulations set by Party A.

3Party B shall, in accordance with the characteristics of this project, formulate a civil construction system and enhance management.

4Construction site uniforms must be uniform and tidy to maintain a civil construction image. Unauthorized entry or exit is prohibited in non-construction areas.

5Strictly control secondary pollution during construction to ensure the cleanliness of the site.

6Maintain cleanliness and hygiene on-site, promptly clearing ground debris.

7Comply strictly with the other relevant regulations on civil construction as stipulated by Party A.

 

 

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $100.00 / square meters
Sales None
Delivery JiangsuYancheng3dayswithin
Stock 9999square metersMOQ1square meters
Brand Chimney corrosion prevention
Highness 40-220 meters
Unit 6
Seat 10,000 square meters
Expiry Long Valid
Update 2023-07-14 10:31
Gallery

Jiangsu XinDa High Altitude Engineering Co., Ltd.Published byPower plant and chemical industry chimney beautification, anticorrosion, and color ring coatingGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top