Shandong Chengyi Plastic Products Co., Ltd.VIP

防撞扶手,无障碍扶手,建筑装饰工程
Enter Shop

Chengyi Protection CY-38 Corridor Handrail - Manufacturer of Corridor Handrails

平台认证
  • Unit Price

    $49.00/Piece

  • Brand

    Chengyi Protection

  • MOQ

    100Piece

Contact
Leave Msg

Platform Service

Supplier Verified



山东程益塑料制品有限公司

VIP   采商通第3年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Chengyi Protection

  • Unit Price:

    $49.00 / Piece

  • MOQ:

    MOQ100Piece

  • Total:

    10000Piece

  • Address:

    ShandongJinan

  • Delivery:

    3days

  • View More

Description

What are the seven steps for installing a corridor handrail?As the focus on corridor handrails increases, many people are starting to pay attention to the knowledge surrounding them. Some are even asking how to install corridor handrails? Let's take a look at the editor's introduction together.First, securely install a vertical post at the top and bottom before attaching the handrail. Then, pull a straight line between the two posts above. Place the middle post on the steps (note: you can move the post forward and backward on the steps to align it with the line's height), and mark the drilling points in the post's mounting holes with a marker. Finally, drill and secure the post.2. For installing handrails on a floor already tiled or covered with marble, first use a glass drill bit to make holes. Before drilling, form a circle around the area to be drilled with rubber cement to collect water for better drilling. After using the glass drill bit, drill with a 12mm diameter hammer drill bit. If the base is wooden, you can directly fix the column with self-tapping screws.3. For installing handrails on corridors, you can use thin water pipes. Simply slip them over the wire, and bend them by hand where needed. This method is more labor-saving. For wires thicker than 12mm in diameter, use a wire bending tool. First, measure the bend position of the wire, then bend it and insert it. You can fit the wire hole over the wire, and after positioning the wire, secure the wire hole to the column.4. Fixed Handrail Installation for Corridor Handrails: First, measure the area where the bend is needed. Wrap the handrail section with the desired bend around a heat blanket and heat it for 15-20 minutes until the handrail softens and can be bent. (If the heat blanket is long, you can release it in areas where no bend is required.) Remove the heat blanket, hold the handrail and place it on a post, then apply a cold compress with a warm towel to the handrail to shape it according to the bend. Wipe repeatedly until the handrail sets. If the handrail has scratches during transportation or daily use that affect its appearance, you can also use the heat blanket to heat and wipe to remove the scratches.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $49.00 / Piece
Sales None
Delivery ShandongJinan3dayswithin
Stock 10000PieceMOQ100Piece
Brand Chengyi Protection
Brand Chengyi Protection
Specification 4-meter stand
Aluminum thickness 1.4, 1.5
Expiry Long Valid
Update 2023-06-08 15:20
Gallery

Shandong Chengyi Plastic Products Co., Ltd.Published byChengyi Protection CY-38 Corridor Handrail - Manufacturer of Corridor HandrailsGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top