Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd.VIP

墙面修补 老墙翻新 旧房翻新 墙面翻新 修复墙面 老旧小区改造 屋顶渗漏 特业维修墙面 外墙保温 内墙保温 别墅翻新
Enter Shop

Wuxi External Wall Insulation Project

平台认证
  • Unit Price

    Negotiable

  • Brand

    Jianyu Construction

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



无锡建裕建筑节能工程有限公司

VIP   数字营销第3年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Jianyu Construction

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0Piece

  • Address:

    JiangsuWuxi

  • Delivery:

    3days

  • View More

Description

Exterior Insulation and Finish System (EIFS) Installation Requirements

1. The exterior wall, door, and window construction is complete and has passed the acceptance, with the base surface meeting the requirements of Chapter 5, Section 3 "Concrete Engineering" and Chapter 6, Section 1 "Brickwork Engineering" in the "Standard for Quality Inspection and Appraisal of Construction Quality" (GBT301-88) for multi-story large formwork or for plain walls, respectively.

2. The normal construction temperature for the external wall thermal insulation system is between 5°C and 35°C.

3. Construction sites must ensure road, water, and electricity accessibility.

4. Construction tools and scaffolding should meet the construction requirements (ensuring safety and reliability).

5. Construction site mobile power distribution boxes, potable water pipes should be configured according to the construction requirements.

6. Vertical and horizontal transportation facilities for electrical distribution materials must comply with relevant safety regulations.

7. High-voltage power lines within the construction operation area must maintain a distance in accordance with relevant regulations and be equipped with appropriate protective measures.

8. Remove all obstructions from the wall surfaces to be insulated.

When applying thermal insulation boards, the wind speed should not exceed 5 levels.

10. To ensure construction quality, the construction area should be avoided from prolonged direct sunlight. Note: Construction is not advisable during rain.

11. Construction Tools: Groover, Wallpaper Scissors, Screwdriver, Scissors, Trowel, Brush, Electric Drill, Plastic Mixing Bucket, Hammer Drill, Putty Knife, Wire Holder, 2m Ruler, etc.


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery JiangsuWuxi3dayswithin
Brand Jianyu Construction
Expiry Long Valid
Update 2023-05-09 16:42
Gallery

Wuxi Jianyu Building Energy Conservation Engineering Co., Ltd.Published byWuxi External Wall Insulation ProjectGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top