Guangdong Zhongjian New Materials Co., Ltd.VIP

桥面防水材料 及抛丸项目 防水补漏材料 桥面防水材料 聚氨酯防水涂料 地下室防水材料 水池防水材料
Enter Shop

Modified Asphalt Bridge Deck Waterproofing Coating, Coating for Bridge Construction

平台认证
  • Unit Price

    $100.00/Drum

  • Brand

    Yi Bai Tu

  • MOQ

    1Drum

Contact
Leave Msg

Platform Service

Supplier Verified



广东众建新型材料有限公司

VIP   数字营销第3年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Yi Bai Tu

  • Unit Price:

    $100.00 / Drum

  • MOQ:

    MOQ1Drum

  • Total:

    9999Drum

  • Address:

    GuangdongGuangzhou

  • Delivery:

    3days

  • View More

Description

Product Advantages

1. Eco-friendly products with excellent waterproofing performance; after coating, they solidify to form a seamless, complete elastic waterproof layer.

2. Excellent elongation, aging resistance, strong adaptability to substrates cracking, excellent frost resistance, and low-temperature flexibility.

3. Strong bonding, excellent construction performance, suitable for application on damp substrates without bubbling, good film formation, rapid curing, and short construction cycle.

4. It can also be reinforced with non-woven fabric or glass fiber when in use.

Application Range

Products are used for road and bridge waterproofing projects, and are also suitable for waterproofing of building roofs, terraces, underground, and tunnel engineering.


Construction technique

1. Surface Preparation

(1) The base material must be sturdy, flat, and clean, free of dust, grease, wax, release agents, and other debris.

(2) All small pores and sand holes can be sealed by mixing a small amount of water with Leak King to form a damp paste, then smoothing it out.

Prior to applying the paint material, the substrate can be pre-wetted but should not have any standing water.

2. Surface preparation and cleaning → Application of detailed waterproofing layer → Large-area film-forming waterproofing layer (thin coating applied multiple times) → Sealing of ends and edges → Quality inspection and acceptance → Protection and isolation layer application

(1) Subgrade Treatment: Clear the soil, stones, and debris from the bridge deck. The subgrade surface must be free of dust, dirt, and any accumulation of water, ensuring it is clean and dry.

(2) Construction must be equipped with complete tools, and the surface must be sprayed three times using a high-performance spray gun.

(3) Apply the polymer-modified asphalt waterproofing paint, then allow it to dry before applying the second and third coats of waterproofing paint, continuing until the desired thickness is achieved.

Section 6: Precautions

1. This product is suitable for use in temperatures ranging from 5°C to 35°C. It must be protected from rain, intense sunlight exposure, and frost during the construction process.

2. If there is any sediment, it does not affect the quality; simply stir well before use.

3. Material Storage: Strictly prohibited from high temperature exposure. If the drum cover is opened, seal it immediately after use; be cautious of freezing at 0℃.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $100.00 / Drum
Sales None
Delivery GuangdongGuangzhou3dayswithin
Stock 9999DrumMOQ1Drum
Brand Yi Bai Tu
Type High-performance Waterproof Coating
Construction Method Spray
Properties of the film-forming material Organic
Expiry Long Valid
Update 2023-04-12 09:54
Gallery

Guangdong Zhongjian New Materials Co., Ltd.Published byModified Asphalt Bridge Deck Waterproofing Coating, Coating for Bridge ConstructionGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top