Main Business: Shanxi fire reserve ponds, Taiyuan fire ponds, Shanxi cement fire reserve ponds, Taiyuan concrete fire reserve ponds, Shanxi prefabricated fire reserve ponds, Taiyuan prefabricated fire reserve ponds, etc. Welcome to call for inquiries.
Today, I'll introduce some knowledge about firewater storage tanks. Those interested might want to take a look!
Fire pond template construction must comply with the following requirements:
Ensure the correct shape, size, and positioning of all parts of the engineering structure and components.
(2) Sufficient in strength, rigidity, and stability to bear the dynamic loads, lateral pressures, and self-weight of cast-in-place concrete.
(3) Simple structure, easy to assemble and disassemble, and convenient for rebar tying and installation, concrete pouring, and curing.
(4) Templates must have tight seams with no leakage.
This issue's content is shared here. For more exciting information, please keep following us!

































