Cleanliness and disinfection of the cleanroom in the purification workshop
Ceiling and walls: Wipe clean with a dust-free towel dampened with pure water, then use a clean, dust-free towel soaked in disinfectant for擦拭.
Cleanroom and other surfaces: Wipe with a clean, dust-free towel moistened with pure water, then wipe with a clean, dust-free towel dipped in disinfectant.
Cleanroom Status Indicator:
The sampling room must have clear status indicators, such as: In Use, Cleaned, and To Be Cleaned. When sampling is in progress, the ISO 7 cleanroom should be marked as "In Use"; after cleaning is completed, it should be marked as "Cleaned"; (cleanroom) when sampling is just finished and needs to be cleaned, it should be marked as "To Be Cleaned."

The construction process for a clean room primarily includes the following points:
Construction Drawing Design: Determine the initial construction process plan of the preliminary purification workshop as the construction drawing design.
Engineering: Construction to be carried out according to the purification workshop construction drawings.
Adjustment and Inspection: Conduct debugging and purification of the workshop construction process and inspection according to acceptance specifications and contract requirements.
Completion and Handover: Conduct final acceptance inspection and deliver to the customer for use.
Maintenance Services: Take responsibility and provide services after the construction warranty period for净化车间. Achieve facilities that operate economically, saving energy, easy to maintain, and cost-effective. When designing the construction of industrial workshops, it is necessary to effectively utilize spaces for production processes, purification air conditioning, and public power facilities, achieving savings in area, reducing energy consumption, and preventing pollution or cross-contamination. Physical purification methods
Activated carbon filters. Activated carbon is a porous carbon material with highly developed pore structures. Its porous structure provides a large surface area, allowing for complete contact with gases (impurities), making activated carbon adsorbent and easily effective in absorbing and collecting impurities. Just like magnetism, all molecules have an attractive force between them.

What to pay attention to when designing a laboratory clean room
Exhaust system issues
The design of the exhaust system should emphasize its rationality. The selection of the exhaust location is a crucial aspect in meeting process requirements. The purpose of the exhaust system design is to scientifically set the exhaust points and effectively reduce the exhaust volume. The primary way to meet the fresh air volume requirements is to add some exhaust air to the system, but this should not be promoted excessively. When the air leakage from the building and ventilation system is sufficiently large, the addition of exhaust air is redundant, so a detailed understanding of this should be included in the design.

Chizhou's 100,000-Class Clean Room - Anhui Mengjingyuan | Designed and constructed by Anhui Mengjingyuan Environmental Technology Development Co., Ltd. Located at Room 921, Tianrun Building, Northeast corner of Furong Road and Jiaoding Road, Economic and Technological Development Zone, Hefei City, Anhui Province. Striving and developing amidst the surge of market economy, Anhui Mengjingyuan has gained a good reputation in engineering construction. Achieving the status of an all-around networked enterprise marks that our service and management have reached a new height. All employees of Anhui Mengjingyuan are willing to work together with individuals of insight from all walks of life to develop and create a better future.