Yancheng Runping Water Supply Equipment Co., Ltd.VIP

一体化预制泵站 污水提升泵站 箱泵一体化
Enter Shop

RuiPing Water Supply Integrated Pump Box Manufacturer

平台认证
  • Unit Price

    $8000.00/Tai

  • Brand

    Ruanping Water Supply

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



盐城润平供水设备有限公司

VIP   标王第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Ruanping Water Supply

  • Unit Price:

    $8000.00 / Tai

  • MOQ:

    MOQ1Tai

  • Total:

    10000Tai

  • Address:

    JiangsuYancheng

  • Delivery:

    3days

  • View More

Description

Detailed Description:

    Buried pump package

Now, let me tell you about Runping's buried cable.Integrated pump in boxWhat sets it apart from standard water tanks:

1. Standard water tanks are welded, while the integrated submersible pump water tanks are bolted together. There are a total of 3 types of integrated submersible pump water tanks.

Galvanized steel plate, formed by stamping, with each stamping block of the stamping plate bolted together.

(2) SUS304 stainless steel material, formed, the forming blocks of each stamping panel are connected by bolts.

(3) Composed of 3mm galvanized steel and 0.4mm stainless steel composite, these materials vary significantly in price.

Submersible pump integrated water tankWith the ordinaryStainless Steel Water TankConstruction plans vary, and I'll introduce them to you below.Submersible pumpConstruction Plan for Integrated Water Tank

To ensureSubmersible pump and tank integrated unitThe water tank meets high design standards during production. Our company operates in accordance with the enterprise standards issued by the Jiangsu Provincial Administration for Quality and Technical Supervision, with the serial number Q/320925YLP001-2013.

Tank specifications: 25m x 18m x 2.5m = 1125m³

Sheet specifications: Top panel 2.0mm, Side panels 3.0mm/3.0mm/3.0mm, Bottom panel 3.0mm

Anti-float buried water tank construction procedure:

Base panel cutting → Base panel installation → Base panel connection → Base panel sealing inspection → Side panel cutting → Side panel connection → Sealing inspection at side panel connection → Roof panel cutting → Roof panel connection → Roof panel installation

1. According to the design requirements of the tank specifications and models, we use lubricated assembly-style tank module sheets in the factory. First, we mark the sheets, then send them to the cutting machine to be cut into 106x106cm blocks. After cutting the sheets, we trim the four corners to 90-degree angles, and then send them to the hydraulic press to mold them into 100x100cm and 50x50cm concave-convex panels, with all flanges being 90 degrees.

2. Upon arrival on-site, first assemble the forming panels using bolted and sealed connections with bolts and gaskets. Connect the panels according to the tank's dimensions of length x width x height, assembling them into several tank panels or dividing them into sections for bolted connections based on the tank's length and height. The top layer of the water tank is connected with bolts.

3. After assembling several panels, prepare for the bottom assembly connection. When bolting the bottom panel, the manufacturer of the buried box pump integrated unit should first seal the bottom panel dimensions, arrange the bottom plate for sealing connection on the bottom panel, and then perform fire oil inspection and visual inspection on the sealed section to prevent loose seals and other phenomena.

4. After the base panel is connected, proceed to join the wall panel with the base panel. Bolt connection involves first placing one side's code on the base of the water tank, followed by the codes on all four sides. Adjust the flanges for connection, with the general relative angle being below 2mm. The connection should be straight, and the corners must have a 90-degree connection between the base and the wall.

5. After the bottom of the water tank is sealed to the wall with bolts and gaskets, it is then connected to the top and wall, with the edges aligned to form a basically straight horizontal line. According to customer requirements, the manhole of the water tank is connected at the specified location, usually installed near the float ball of the inlet hole.

6. After the water tank connections are sealed, proceed to open the inlet, outlet, overflow, drain, fire hydrant, and install the ladder near the manhole.




Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $8000.00 / Tai
Sales None
Delivery JiangsuYancheng3dayswithin
Stock 10000TaiMOQ1Tai
Brand Ruanping Water Supply
Specs Made-to-Order
Application Water Supply & Drainage
Work pressure Atmospheric Pressure
Expiry Long Valid
Update 2023-03-27 15:55
Gallery

Yancheng Runping Water Supply Equipment Co., Ltd.Published byRuiPing Water Supply Integrated Pump Box ManufacturerGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top