Yancheng Runping Water Supply Equipment Co., Ltd.VIP

一体化预制泵站 污水提升泵站 箱泵一体化
Enter Shop

Water Supply System with Integrated Pump and Box

平台认证
  • Unit Price

    $10000.00/Tai

  • Brand

    Ruanping Water Supply

  • MOQ

    1Tai

Contact
Leave Msg

Platform Service

Supplier Verified



盐城润平供水设备有限公司

VIP   标王第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Ruanping Water Supply

  • Unit Price:

    $10000.00 / Tai

  • MOQ:

    MOQ1Tai

  • Total:

    10000Tai

  • Address:

    JiangsuYancheng

  • Delivery:

    3days

  • View More

Description

Detailed Description:

    Submerged pump integrated unit

Now, let me tell you about Runping's buried ground.Integrated pump and containerDistinctive features from the standard water tank:

1. Standard water tanks are welded, while the integrated submersible pump water tanks are bolted together. There are three types of integrated submersible pump water tanks:

Galvanized steel sheet, stamped into shape; each stamping block of the individual stamping plate is bolted together.

(2) SUS304 stainless steel material, formed, with the forming blocks of each stamping panel connected by bolts.

(3) Composed of 3mm galvanized steel plate and 0.4mm stainless steel composite, these materials vary significantly in price.

Submersible pump integrated water tankWith ordinaryStainless Steel Water TankConstruction plans vary as well; I'll introduce them to you below.Buried pump boxIntegrated Water Tank Construction Plan

To ensureSubmersible pump station integrated unitThe water tank meets higher design standards during production. Our company follows the corporate standards issued by the Jiangsu Provincial Administration for Quality and Technical Supervision, with the code Q/320925YLP001-2013.

Tank specifications: 25m x 18m x 2.5m = 1125 m³

Sheet specifications: Top panel 2.0mm, Side panels 3.0mm/3.0mm/3.0mm, Bottom panel 3.0mm

Anti-float buried water tank construction procedure:

Bottom plate cutting → Bottom plate installation → Bottom plate connection → Bottom plate sealing inspection → Side panel cutting → Side panel connection → Sealing inspection at side panel connection → Top plate cutting → Top plate connection → Top plate installation

1. According to the design requirements for the water tank specifications and models, we use lubricated assembly-type water tank module sheets within the factory. First, we mark the sheets, then send them to the shearing machine to cut them into 106×106cm pieces. After cutting, we trim the four corners to 90-degree angles, and then send them to the hydraulic press to mold them into 100×100cm and 50×50cm embossed and debossed panels, with all flanges being 90 degrees.

2. Upon arrival at the site, first assemble the molding panels, utilizing bolt and seal technology for sealed connections.螺栓 connect the panels based on the tank's dimensions (length × width × height), forming several panels of the tank or dividing them into sections for bolted connections along the tank's length and height. The top layer of the water tank is connected using bolts.

3. After assembling several panels, prepare for the bottom assembly connection. When bolting the bottom panel, the manufacturer of the buried box pump integration should first seal the bottom panel dimensions. Arrange the bottom panel on the bottom for sealing connection. After the bottom panel connection, conduct oil leakage checks and visual inspections on the sealing parts to prevent loose seals and other issues.

4. After the base panel is connected, proceed to join the wall panel and base panel. The bolt connection starts by placing the code on one side of the water tank's base panel. After placing the codes on all four sides, adjust the flanges for connection. The relative angles of the dimensions are generally below 2mm, and they must be straight. The corners require a 90-degree connection between the base and the wall.

5. After the bottom of the tank is sealed to the wall with bolts and gaskets, it is then connected to the top and the wall, with the edges requiring a basically level straight line. According to customer specifications, the manhole of the tank is connected at the designated location, usually installed near the float ball of the inlet opening.

6. After the water tank is sealed, proceed to open the inlet, outlet, overflow, drain, fire hydrant, and install the ladder near the manhole.



Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $10000.00 / Tai
Sales None
Delivery JiangsuYancheng3dayswithin
Stock 10000TaiMOQ1Tai
Brand Ruanping Water Supply
Custom Processing & Tailoring Support
Transfer Liquid Wastewater, rainwater, and effluent
Function Landscaping & Environmental Protection
Expiry Long Valid
Update 2023-03-27 15:55
Gallery

Yancheng Runping Water Supply Equipment Co., Ltd.Published byWater Supply System with Integrated Pump and BoxGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top