Beijing Zhonghua Construction Engineering Technology Co., Ltd.VIP

绳锯切割、混凝土切割
Enter Shop

Beijing Foundation Subsidence Grouting Reinforcement, Building Subsidence Grouting Reinforcement, Factory Subsidence Grouting

平台认证
  • Unit Price

    $1.00/1. Please provide the Chinese content to be translated.

  • Brand

    Medium-line Construction

  • MOQ

    11. Please provide the Chinese content to be translated.

Contact
Leave Msg

Platform Service

Supplier Verified



北京中划建筑工程技术有限公司

VIP   数字营销第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Medium-line Construction

  • Unit Price:

    $1.00 / 1. Please provide the Chinese content to be translated.

  • MOQ:

    MOQ11. Please provide the Chinese content to be translated.

  • Total:

    1001. Please provide the Chinese content to be translated.

  • Address:

    Beijing

  • Delivery:

    3days

  • View More

Description

What are the causes of ground subsidence?


1. Excessive self-weight of the building


The foundation is designed to bear the weight of buildings, with a limited load-bearing capacity. It is typically constructed based on the designed weight of the building. If the calculations are insufficient and the foundation's load-bearing capacity is exceeded, it can lead to foundation settlement.


2. The elastic modulus of the subsoil is relatively low.


Improper foundation construction, such as insufficient soil elastic modulus, can lead to noticeable settlement.




3. There is a soft underlying layer beneath the foundation soil.


If the soil beneath the foundation is loose, over time, gravity will cause the foundation to slowly sink, leading to localized or overall subsidence.


4. Foundation Damage


If two buildings are too close together, the foundations will be subjected to squeezing due to stress diffusion, which will inevitably lead to sinking.


5. Groundwater level decline


Groundwater is under pressure; excessive extraction can cause it to lose pressure, leading to ground subsidence.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $1.00 / 1. Please provide the Chinese content to be translated.
Sales None
Delivery Beijing3dayswithin
Stock 1001. Please provide the Chinese content to be translated.MOQ11. Please provide the Chinese content to be translated.
Brand Medium-line Construction
Foundation settlement 1/600
Factory sinking 1/500
Chemical Plant Cutting 1/600
Expiry Long Valid
Update 2023-08-01 11:34
Gallery

Beijing Zhonghua Construction Engineering Technology Co., Ltd.Published byBeijing Foundation Subsidence Grouting Reinforcement, Building Subsidence Grouting Reinforcement, Factory Subsidence GroutingGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top