Hangzhou Qingpeng Special Engineering Technology Co., Ltd.VIP

建筑物拆除作业:基坑围护混凝土支撑梁、桥梁、地下连续墙、岩石、建筑结构梁、板、墙、柱等钢筋混凝土构筑物静力切割、破除以及桩头凿除、工程打孔、开孔取芯等。 建筑结构加固:粘钢、包钢、碳纤维、加大截面、植筋、锚栓、压力注浆、锚杆静压桩等建筑结构加固补强等。 建筑劳务分包;城市建筑垃圾处置(清运);建设工程施工;建筑工程机械与设备租赁;高性能纤维及复合材料销售;建筑装饰材料销售;土石方工程施工。
Enter Shop

Support beam removal, Non-destructive dismantling, Concrete support removal report

平台认证
  • Unit Price

    $156.00

  • Brand

    Ching Peng Construction

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



杭州庆鹏建筑特种工程技术有限公司

VIP   数字营销第4年
资料通过中商114认证
Category
  • No Category

Product Details

Specs

Gallery

  • Brand:

    Ching Peng Construction

  • Unit Price:

    $156.00

  • MOQ:

  • Total:

    0

  • Address:

    ZhejiangHangzhou

  • Delivery:

    3days

  • View More

Description

Support Removal, Bridge Demolition, Concrete Support Cutting - What are the Methods for Support Beam Removal? "Qingpeng Construction" provides a detailed explanation of the foundation support beam removal process.

Support beam removal methods typically include blasting, mechanical demolition, manual dismantling, static blasting, and wire saw cutting.

Various Demolition Methods - Features:

(1) Blasting Demolition: Instant release of explosive pressure, short construction period, suitable for overall demolition of buildings in open areas. However, in busy city districts and densely populated areas, it causes significant vibrations, which have a considerable impact on existing structures, surrounding buildings, and underground facilities. It also poses a risk of flying debris to pedestrians on the streets. Not applicable for removing support beams in foundation pits, and it is expensive.

(2) Mechanical Demolition: Utilizes explosive machines for demolition, which results in significant vibration, noise, and dust. Not suitable for construction in urban areas, residential neighborhoods, or along subway lines, and渣土清理 takes a long time.

(3) Manual Demolition: Manual jackhammer demolition offers high safety but is time-consuming, also noisy, and generates a lot of dust. It is only suitable for small-scale projects.

(4) Static Explosive Demolition: Utilizes static expansion agents for a quiet, non-vibrating demolition that gradually transfers force to the concrete supports, causing them to fracture. This method is safe, with no flying debris, low noise, but it is time-consuming and the construction process is slow.

(5) Wire Saw Cutting Demolition: Utilizes static rope sawing to cut support beams into segments, which are then lifted out by cranes, loaded onto trucks for transportation to the site, and crushed for waste recycling. Compliant with environmental protection standards, it offers no vibration, noise, dust, or pollution, with a short project timeline and fast execution. It is the most widely used and general demolition method currently available.

Qingpeng Special Engineering Technology Co., Ltd. is centered in Zhejiang, extending its services to surrounding provinces and cities. We undertake the cutting and demolition of bridges of all sizes across the country, subway support beams, foundation pit retaining beams for building construction, temporary supports and simply supported beams for road and bridge projects, as well as for commercial centers,OfficeStructural transformation, cutting, and demolition projects for residential and commercial buildings have received unanimous praise from a wide range of users. Seeking competition through quality, development through strength, survival through credibility, and exchange through sincerity.CollaborationOur service approach is committed to safety, strict management, civilized construction, and racing against time to expedite project schedules. We will offer you competitive prices to achieve a win-win situation for both of us and to foster a lifelong friendship through a single collaboration.



Support Beam Cutting Process: Set up bottom support for the beam → Mark cutting sections → Mechanical equipment arrives for electricity and water supply → Cut and section support beam, girder construction → Forklifts, cranes, and waste mud trucks arrive for transport (or on-site crushing), and shipment of concrete blocks → Concrete blocks crushed by oil炮 machine → Steel recycling → Site cleanup

Structural Column Treatment: Structural column removal is conducted after the basement structure is completed. Segmentation cutting is performed on the bottom and top surfaces of each floor using oxygen welding, followed by transportation to the site using forklifts via the access lane.

With the development and construction of cities, land in urban areas is becoming increasingly scarce. As engineering projects require deeper excavation for basements, the support beams for pit support are inevitably installed to ensure the safety of the pit and its surroundings. During the construction of the basement structure, the support beams must be removed before proceeding to the next stage. The speed of removing these beams directly impacts the progress of the project and may lead to issues such as worker downtime.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $156.00
Inquiry None
Delivery ZhejiangHangzhou3dayswithin
Brand Ching Peng Construction
Service Content Support removal, bridge removal, renovation, opening doorways, support
Application Scope Engineering Contracting
Brand Ching Peng Construction
Expiry Long Valid
Update 2022-10-18 10:16
Gallery

Hangzhou Qingpeng Special Engineering Technology Co., Ltd.Published bySupport beam removal, Non-destructive dismantling, Concrete support removal reportGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top