Xinhe Ruisen Hydropower Machinery Factory.VIP

启闭机、闸门、卷扬机、拦污栅、清污机、橡胶止水、污水处理设备、水泵、电机、阀门、起重设备、桥梁支座、桥梁伸缩缝、土工布、土工膜、泡沫板 生产、销售、安装
Enter Shop

Manual Winch - Ruisen Hydropower Machinery - Manufacturer Direct, Competitive Prices, Installation and Commissioning Provided

平台认证
  • Unit Price

    Negotiable

  • Brand

    Rui鑫

  • MOQ

    1Vehicle

Contact
Leave Msg

Platform Service

Supplier Verified



新河县瑞鑫水工机械厂.

VIP   标王第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Rui鑫

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1Vehicle

  • Total:

    999Vehicle

  • Address:

    HebeiXingtai

  • Delivery:

    3days

  • View More

Description

Once the winch equipment is set up, it is necessary to inspect and adjust it.

1. Open Gear Drive cm02, with a tooth side clearance of 0.42 mm, the contact area along the tooth height is not less than 40%, and along the tooth length is not less than 50%.

2. Inspect the transmission systems of the braking unit for smooth operation and secure fit, and adjust the gap between the brake shoes and the brake wheel when releasing the lever to no more than 0.7-0.8mm.

3. Inspect the operation and stability of all transmission systems of the safety brake and adjust the slack in the brake shoes and brake wheel to ensure the gap is not more than 1.5mm when releasing the brake.

4. Verify that the control electrical equipment for the operating and safety brakes is interlocked with the main motor, i.e., recommend releasing the operating brake of the main motor, and the operating brake of the auxiliary motor is engaged, while only releasing the safety brake is recommended to adjust the main motor.

Winch with smooth surface

1. Select winter gear oil or full cylinder oil for the reducer to ensure smooth operation, with the oil level ensuring the worm shaft is fully submerged in oil. Change the oil for the reducer once a year.

2. The main shaft bearings and the output shaft of the reducer should be timely replaced or supplemented with No. 4 calcium-based grease, changing the oil every two years.

3. Prior to each operation, lubricate the open gears with smooth oil.

4. All other smooth areas should be lubricated before each operation, particularly the thrust rings between the two gears on the reducer output shaft and the sleeve of the sliding gear should be lubricated with grease.

Winch trial operation

Winch equipment, upon completion, after inspection and adjustment and confirmation of no discrepancies, may be oiled for smooth operation. Perform a no-load test run, then proceed with load operation, gradually increasing to the rated load. Under standard voltage, the current does not exceed the rated value, and the motor, reducer, and other components do not overheat.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HebeiXingtai3dayswithin
Stock 999VehicleMOQ1Vehicle
Brand Rui鑫
Customized Processing Is
Applicable Fields Mining
Traction 140 (KN)
Expiry Long Valid
Update 2022-09-17 16:00
Gallery

Xinhe Ruisen Hydropower Machinery Factory.Published byManual Winch - Ruisen Hydropower Machinery - Manufacturer Direct, Competitive Prices, Installation and Commissioning ProvidedGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top