Xinhe County Ruixin Hydropower Machinery FactoryVIP

启闭机、闸门、卷扬机、拦污栅、清污机、橡胶止水、污水处理设备、水泵、电机、阀门、起重设备、桥梁支座、桥梁伸缩缝、土工布、土工膜、泡沫板 生产、销售、安装
Enter Shop

Manual Winch - Ruixin Hydropower Machinery - Manufacturer Direct, Competitive Pricing, Installation and Commissioning Included

平台认证
  • Unit Price

    Negotiable

  • Brand

    Ruisen

  • MOQ

    1Vehicle

Contact
Leave Msg

Platform Service

Supplier Verified



新河县瑞鑫水工机械厂

VIP   数字营销第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Ruisen

  • Unit Price:

    Negotiable

  • MOQ:

    MOQ1Vehicle

  • Total:

    999Vehicle

  • Address:

    HebeiXingtai

  • Delivery:

    3days

  • View More

Description

Once the winch equipment is ready, it is necessary to inspect and adjust it.

1. Open Gear Drive cm02, with a tooth side clearance of 0.42mm, the contact area along the tooth height is not less than 40%, and the extension length is not less than 50%.

2. Check that all transmission systems of the braking mechanism are smooth and secure, and adjust so that the clearance between the brake shoe and the brake drum when the brake is released is not more than 0.7-0.8mm.

3. Inspect the operation and security of the braking system's transmission components, and adjust the release mechanism so that the gap between the brake shoes and the brake wheel is no more than 1.5mm when the lever is released.

4. Verify that the control electrical equipment for the operating brake and the safety brake is interlocked with the main motor, i.e., recommend releasing the operating brake of the main motor, engage the operating brake of the auxiliary motor, and only adjust the main motor when the safety brake is released.

Winch with smooth surface

1. Select winter gear oil or full cylinder oil for the reducer to ensure smooth operation, with the oil level ensuring that the worm shaft is fully immersed in oil. Change the oil for the reducer annually.

2. The main shaft bearings and the output shafts of the reducers should be timely replaced or supplemented with No. 4 calcium-based grease, changing the oil every two years.

3. Prior to each drive, lubricate the open gears with smooth oil.

4. Any other smooth areas should be lubricated before each operation, particularly the thrust ring between the two gears on the reducer output shaft and the sleeve of the movable gear, which should be oiled with lubricant.

Winch trial operation

Winch equipment, upon completion, is to be inspected and adjusted. Once confirmed error-free, oil the smooth parts for lubrication, perform a no-load test operation, then proceed with load testing, gradually increasing to the rated load. Under standard voltage, the current does not exceed the rated value, and there is no heat generation in the motor, reducer, and other components.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HebeiXingtai3dayswithin
Stock 999VehicleMOQ1Vehicle
Brand Ruisen
Customized Processing Is
Applicable Fields Mining
Traction 140 (KN)
Expiry Long Valid
Update 2022-09-17 16:00
Gallery

Xinhe County Ruixin Hydropower Machinery FactoryPublished byManual Winch - Ruixin Hydropower Machinery - Manufacturer Direct, Competitive Pricing, Installation and Commissioning IncludedGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top