Yichengxing Environmental Engineering Co., Ltd. XinjiangVIP

新疆易星辰环境工程是一家专业设计、策划、制作、研发一条龙的专业标识标牌生产厂家。主营:各种交通标志牌,标志杆,标识标牌,信号灯,红绿灯,太阳能路灯,高杆灯,庭院灯,景观灯,各类标识导视系统,户外宣传栏,不锈钢宣传栏,精神堡垒等广告业务!
Enter Shop

Tall post

平台认证
  • Unit Price

    Negotiable

  • Brand

    Easy Star

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



新疆易星辰环境工程有限公司

VIP   数字营销第4年
资料通过中商114认证

Merchant Products

Product Details

Specs

Gallery

  • Brand:

    Easy Star

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0

  • Address:

    XinjiangUrumqi

  • Delivery:

    3days

  • View More

Description

High-rise column advertisement production, building signages, and facade lighting projects!

For the actual construction of high columns, equip with the necessary machinery and equipment, skilled technical workers, and strictly adhere to the contract documents. Based on the principle of resource optimization, select and configure a complete set of professional machinery and detection instruments according to the overall construction plan and detailed construction methods for this project. Provide an adequate number of professional construction teams and skilled workers to ensure the progress, quality, and safety of the construction.

Construction projects require a large quantity of materials, including main purchased items like cement, wood, and steel, as well as bulk local materials such as sand and gravel. The materials department actively procures and supplies these, extensively investigates material sources, expands supply channels, organizes deliveries according to usage plans, ensures project requirements are met, and also works with the testing department to maintain the quality of incoming raw materials.

Under the leadership of the Project Chief Engineer, in accordance with the construction regulations and systems based on the project method, combining the characteristics of the project, and in accordance with the company's construction technology management regulations, practical and feasible technical management measures are formulated. These measures are to be implemented and supervised by the Project Chief Engineer. The main contents are as follows:

Gather meteorological, topographical, hydrogeological conditions to provide necessary basis for compiling special construction plans and guiding construction. Promptly organize relevant personnel to familiarize themselves with design drawings, understand design intent and related details, clarify quality requirements, and verify issues and doubts on the drawings. Actively cooperate with the owner and design department in completing design drawing briefing before construction, aiming to resolve issues on the drawings as much as possible before the project begins.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery XinjiangUrumqi3dayswithin
Brand Easy Star
Company Name EasyStar
Service Scope Xinjiang
Origin Xinjiang
Expiry Long Valid
Update 2022-06-02 16:49
Gallery

Yichengxing Environmental Engineering Co., Ltd. XinjiangPublished byTall postGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top