High-rise column advertising production, building facade large letters, and facade lighting engineering!
For the actual construction of high columns, equip with the necessary machinery and equipment, skilled technical workers, and strictly adhere to the contract documents. Based on the principle of resource optimization, select and configure a complete set of professional machinery and detection instruments according to the overall construction plan and detailed construction methods for this project. Provide an adequate number of professional construction teams and skilled workers to ensure the progress, quality, and safety of the construction.
Construction projects require a large volume of materials, including major purchased items such as cement, wood, and steel, as well as bulk local materials like sand and gravel. The materials department actively procures and supplies these, extensively investigates material sources, broadens supply channels, organizes the materials according to usage plans, ensures their use in the project, and simultaneously collaborates with the testing department to maintain the quality of incoming raw materials.
Under the leadership of the Project Chief Engineer, in accordance with the construction regulations and systems based on the project method, combined with the characteristics of the project, and in accordance with the company's construction technology management regulations, practical and feasible technical management measures are formulated. The Project Chief Engineer is responsible for the implementation and enforcement of these measures. The main contents are as follows:
Gather meteorological, topographical, hydrogeological conditions to provide necessary bases for compiling special construction plans and guiding the construction process. Timely organize personnel to familiarize themselves with design drawings, understand design intentions and relevant details, clarify quality requirements, and check for issues and questions on the drawings. Actively cooperate with the owner and design department to complete pre-construction design drawing briefings, and strive to resolve drawing issues before the start of the project.